We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wan...
Read full review
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I compared it to competitors and I will definitely be becoming back.
Complete Your Outdoor Project
Most paver jobs around Southfield pair this sand with a compacted gravel base underneath and edge restraints to keep everything locked in place once traffic and freeze-thaw cycles start. If you are doing mortar work, you will also want your cement and any decorative stone veneer on hand before the load arrives. Some crews are shifting to chip stone for paver bedding instead, since it does not pump the way sand can under repeated freeze-thaw, worth asking about if you want the more current approach.
Southfield's clay loam holds moisture longer than sandy soils, so if you are setting pavers, do not skip a compacted gravel base under the sand layer, the sand alone will not drain the way it might in a sandier region. Screed the sand bedding layer to an even 1 inch just before laying pavers, not days ahead, since exposed sand can absorb ground moisture from the clay below and settle unevenly before you even start.
A common mistake on mortar jobs here is mixing on a rainy or humid day without adjusting water ratios, since this sand is finer than concrete sand and takes on moisture differently. Test your mix consistency in small batches first. Timing matters too, plan masonry and paver work for the drier stretch between late spring and early fall rather than right after the May thaw when everything is still saturated.
If your project is paver bedding specifically, ask about chip stone instead of sand, since sand bedding is increasingly being replaced because it can pump out from under pavers over time with freeze-thaw cycling, something Southfield sees plenty of given its winters. For mortar mixing or pool base work, though, this sand remains the right call and pairs well with a bulk cement order to avoid multiple small purchases.
Working With Sand in Southfield
Southfield sits on clay loam that holds water and stays cool into spring, which is part of why builders here rely on a clean, uniform sand rather than native soil for anything structural. With a last frost around May 3 and hardscape work often starting right after, contractors want a bedding and jointing material that will not shift once the clay underneath softens with spring rain. This sand is finer and more consistent than concrete sand, which is exactly what makes mortar mixes workable on masonry jobs across the city. It is also a common pick for pool base work where a level, stable layer matters more than drainage.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.