Ordered Dirt. Received Dirt. Would Buy Again.

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
Wonderful experience! They put the mulch exactly where we wanted. This mulch spread very easily and didn’t have the usual “mulch smell.” We will de...
Read full review
Wonderful experience! They put the mulch exactly where we wanted. This mulch spread very easily and didn’t have the usual “mulch smell.” We will definitely use again!
Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of cautio...
Read full review
Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!
Complete Your Outdoor Project
Most fill jobs get capped with a few inches of topsoil once the grade is set, especially if grass or beds are going back in on top. If you are backfilling around a foundation or a removed structure, a layer of gravel underneath for drainage is common before the fill goes in. Mulch or topsoil orders are easy to add once the structural work is done.
St. Louis clay does not forgive shortcuts on compaction. Place fill dirt in lifts of 6 to 8 inches and compact each layer before adding the next, whether you are using a hand tamper or a plate compactor for larger areas. Skipping this step and filling deep in one pass is the number one reason people end up with a sunken yard or a cracked patio slab a year or two later, especially over pool backfills where the cavity walls can trap water against uncompacted fill.
Fill dirt is not a growing medium, and trying to plant directly into it around here usually fails because the clay-heavy subsoil compacts too tight for roots to push through. Once your grade is set and compacted, cap it with 4 to 6 inches of actual topsoil before seeding or laying sod. This is especially important on foundation backfills where drainage away from the house matters as much as the grade itself.
If you are backfilling a large low area or an old pool, break the job into fill dirt for bulk volume and a thinner topsoil cap for anything that needs to grow, rather than paying for topsoil depth you do not need structurally. Pairing a gravel base under the fill in wet-draining areas of the yard also reduces how often you will need to come back and re-grade after a wet St. Louis spring.
Grading and Filling in St. Louis
St. Louis sits on heavy clay that compacts hard when wet and cracks when it dries out, which means a lot of older homes near downtown and the Hill have settled foundations and low yards that pool water after storms. Fill dirt is the structural fix for that, used to raise grade around a foundation or backfill a removed pool before anything else goes in. Because the clay base here does not drain fast, getting the grade right with compacted fill matters more than it would in sandier soil. This is not topsoil and it will not support planting on its own, it is the base layer underneath.
What Clean Fill Is
Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.
Fill Dirt vs Topsoil
Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.
Compact in Lifts
Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.