About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

One cubic yard covers about 54 square feet at a 6 inch depth, and most fill projects here run 6 to 12 inches depending on how much grade you need to make up. Measure the low area in square feet, decide your target depth, and work backward from the 54 square foot per yard figure at 6 inches, doubling material if you are going a full 12 inches. Order by the cubic yard and round up rather than down, since running short mid-project means a second delivery and a delay.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Vermilion Fill Dirt Delivery

Vermilion Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

One cubic yard covers about 54 square feet at a 6 inch depth, and most fill projects here run 6 to 12 inches depending on how much grade you need to make up. Measure the low area in square feet, decide your target depth, and work backward from the 54 square foot per yard figure at 6 inches, doubling material if you are going a full 12 inches. Order by the cubic yard and round up rather than down, since running short mid-project means a second delivery and a delay.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Vermilion Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs finish with a cap of topsoil once the structural grade is set, especially if grass or beds are going in on top. Compactable gravel is worth having on hand near foundations or pool walls where drainage matters more than a soft cap. If you are landscaping over the fill later, order the topsoil at the same time so both loads can be scheduled together.

Mulch Mound Pro Tip

Do not dump fill dirt in one deep pour and walk away. Place it in 6 to 8 inch lifts and compact each one with a plate compactor or hand tamper before adding the next layer. Skipping this step is the single most common reason people call us back a year later asking why their yard has a sunken patch near the foundation. On Vermilion's clay subgrade, uncompacted fill settles unevenly as the ground freezes and thaws each winter.

Mulch Mound Pro Tip

Fill dirt is not a growing medium, it is subsoil stripped of organic material on purpose so it does not decompose and sink over time. If grass, shrubs, or a garden bed is going on top, cap the compacted fill with 4 to 6 inches of actual topsoil. Skipping the cap and planting straight into fill dirt usually means stunted growth, since there is little nutrient content and drainage behaves differently than in native soil.

Mulch Mound Pro Tip

If you are backfilling around a pool or foundation wall in Vermilion, ask about the fill's drainage behavior before you commit to depth. Straight subsoil compacts well but does not drain as fast as a sand or gravel blend, which matters if water tends to pool against the structure. Ordering a bit extra fill dirt alongside a smaller amount of gravel for the last few inches near the wall often solves the problem cheaper than over ordering either material alone.

Grading and Filling in Vermilion

Vermilion's silty clay drains slowly, which is exactly why so many yards near the harbor and further inland end up with low spots that hold water after a hard rain. Fill dirt gives you a structural base to raise that grade or square up a foundation excavation before the clay underneath causes more trouble. Because it is subsoil, not topsoil, it will not settle from organic breakdown the way compost-heavy fill does. It just needs to be compacted right, which matters more here than in sandier soils since clay subgrade already moves with freeze thaw cycles through Vermilion's winters.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Is fill dirt the same as topsoil for my Vermilion yard?

No, fill dirt is subsoil meant to raise or build up grade, and it will not support plant growth well on its own. Topsoil is the nutrient rich layer you plant into. Most projects use fill dirt to establish the structural grade and then cap it with a few inches of topsoil where grass or plants are going in.

Answer

How many cubic yards of fill dirt do I need to raise a low spot in my yard?

One cubic yard covers about 54 square feet at 6 inches deep. Measure your low area's square footage, pick a depth between 6 and 12 inches based on how much it needs to come up, and divide accordingly. A 300 square foot spot at 6 inches runs roughly 5.5 cubic yards.

Answer

When is the best time to bring in fill dirt around here?

Fill dirt is a job driven material, not a seasonal one, so timing depends on your project rather than the calendar. That said, working the clay soil common in Vermilion is easier when it is not saturated or frozen, so late fall through early spring can be tougher to compact well. Aim for drier stretches when possible.

Answer

Where will the truck place the fill dirt on delivery day?

We place the load wherever you specify at checkout, whether that is a driveway, a side yard, or as close to the work area as the truck can safely reach. Make sure there is a clear path of at least a standard truck width, and flag the exact drop spot if it is not obvious.

Answer

Should I use fill dirt or gravel for backfilling around my foundation?

Fill dirt compacts into a solid structural base and is generally the more economical choice for bulk backfill. Gravel drains faster and is often used in the last several inches near a foundation wall where water needs to move away from the structure. Many jobs use fill dirt for the bulk of the backfill and a thinner gravel layer near the wall.

More delivery around Vermilion, Ohio

All Vermilion, Ohio landscape supply