How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
Highest compliments. Great driver.
Website is easy to navigate. Just a seamless process. 5 stars!!
I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).
Complete Your Outdoor Project
Sand pairs naturally with paver base or road base for the compacted layer underneath, and with the pavers or flagstone themselves on top. If you're building a retaining wall near a clay slope, order it alongside crushed gravel for drainage behind the wall. Crews often bring in both sand and chip stone on the same delivery when they're deciding which bedding approach fits the job.
Because West Jordan's clay soil holds water, do not stage your sand pile directly on bare dirt if rain is forecast, it will pull moisture and clump before you use it. Set it on a tarp or a section of driveway instead. This matters most for mortar mixing, where wet sand throws off your water ratio and makes the mix inconsistent from batch to batch.
A lot of crews still default to sand for paver joints out of habit, but chip stone has largely replaced it for that use because sand pumps out from between pavers over a few winters of freeze thaw cycling. If you're doing joints on a patio meant to last, ask your supplier about chip stone instead and save the fine sand for mortar and pool base work.
Order mortar sand and bedding material separately rather than one blended pile, they serve different jobs and mixing them wastes material. If you're building a wall and doing a patio in the same season, get accurate square footage for each first, since combining a rough guess for both usually means overordering the more expensive fine sand.
Working With Sand in West Jordan
West Jordan sits on alkaline clay that turns hard and slick when wet, which is exactly why builders around Gardner Village and the newer subdivisions lean on sand for drainage and workability instead of fighting the native soil. Hardscape crews here use it to bed paver joints and mix mortar for retaining walls that have to handle our freeze thaw swings between an October first frost and an April last frost. At 4330 feet the temperature drops fast once the sun goes down, so masons want a sand that mixes predictably in cooler working conditions. Fine, uniform sand behaves the same at 40 degrees as it does at 70, which matters more here than in milder climates.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.