About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most jobs call for 6 to 12 inches depending on how much grade you are correcting. Measure the low area or backfill zone in square feet, decide your target depth, and that gets you close to a yard count before compaction. Order by the cubic yard and round up slightly, since compacted fill settles a bit as each lift is tamped down.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Arvada Fill Dirt Delivery

Arvada Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most jobs call for 6 to 12 inches depending on how much grade you are correcting. Measure the low area or backfill zone in square feet, decide your target depth, and that gets you close to a yard count before compaction. Order by the cubic yard and round up slightly, since compacted fill settles a bit as each lift is tamped down.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Arvada Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs finish with a cap of topsoil once the grade is where it needs to be, since fill alone will not support grass or planting beds. If you are backfilling around a pool or foundation, a layer of compacted gravel underneath can help with drainage before the fill goes in. We deliver topsoil and gravel alongside fill dirt so the whole sequence can show up in one trip.

Map of the fill dirt delivery area around Arvada, Colorado

Service area

Areas we deliver fill dirt in Arvada, Colorado

Mulch Mound Pro Tip

Do not dump fill dirt in one deep pile and call it done. Spread it in 6 to 8 inch lifts and compact each one with a plate compactor or hand tamper before adding the next layer. In Arvada's clay loam, skipping this step means the ground keeps sinking for a year or two after, especially around pool decks and foundation backfill where uneven settling can crack concrete later.

Mulch Mound Pro Tip

A common mistake is treating fill dirt like topsoil and trying to plant straight into it. It is subsoil, screened of debris but not amended, so grass and roots struggle in it. Cap your compacted fill with 4 to 6 inches of real topsoil wherever anything needs to grow, and save the fill itself for the structural layers underneath decks, patios, and regraded low spots.

Mulch Mound Pro Tip

If you are backfilling a large area, order fill dirt and topsoil together in one delivery instead of two separate trips. Since Arvada sits above 5,300 feet with a fairly short frost free window, getting both materials on site in one visit means you can compact the fill and cap it with topsoil before the ground turns cold in late September.

Grading and Filling in Arvada

Arvada sits on clay loam that already holds water and shifts with the freeze thaw cycle each winter, so any fill you bring in needs to be compacted properly or it will settle right along with the native ground. This is structural material, not something you plant into, so it gets used to correct grade before topsoil or sod goes on top. With elevation over 5,300 feet and a frost window that runs late September to mid May, we see a steady flow of foundation backfill and low spot regrading jobs whenever the ground is workable. It is not a spring rush material like mulch, people order it whenever a project needs it.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I plant grass directly in fill dirt after grading my yard in Arvada?

No, fill dirt is subsoil meant for structural grading, not a growing medium. After compacting it in lifts to your target grade, cap it with 4 to 6 inches of topsoil before seeding or sodding. Skipping the topsoil cap usually means poor grass growth since fill dirt lacks the organic content roots need.

Answer

How many cubic yards of fill dirt do I need to raise a low spot in my yard?

One cubic yard covers about 54 square feet at a 6 inch depth. Measure the square footage of your low area, decide how deep you need to build it up between 6 and 12 inches, and calculate from there. Add about 10 to 15 percent extra to account for compaction settling once you tamp each lift.

Answer

When is the best time to bring in fill dirt for backfill around a new pool or foundation?

Fill dirt work is driven by your project timeline, not the season, so it can go in whenever the ground is workable. In Arvada that generally means outside the hard freeze stretch from late September to mid May, though many backfill jobs happen right after concrete cures regardless of month. Just compact it in lifts as you go.

Answer

Will the delivery truck be able to access my property in Arvada for a fill dirt drop?

Most residential driveways and street access points in Arvada work fine for a standard delivery truck, but tight lots near Olde Town or homes with narrow alley access should mention that when scheduling. You pick your delivery window at checkout, and the driver places the load as close to your work area as the truck can safely reach.

Answer

What is the difference between fill dirt and topsoil, and can I use one instead of the other?

Fill dirt is subsoil used to raise grade and provide structural backfill, while topsoil is a growing medium with organic content for planting. They serve different jobs, fill dirt goes down first to build up low areas, topsoil caps it where grass or plants need to grow. Using topsoil for structural fill wastes a better material meant for growing.

More delivery around Arvada, Colorado

All Arvada, Colorado landscape supply