About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Very happy with the ease of ordering. Delivery went exactly as planned. Garden soil looks great and couldn’t be happier.

One cubic yard of sand covers about 324 square feet at a 1 inch depth, or roughly half that at 2 inches, which is the typical range for paver bedding and joint work. For mortar mixing, the quantity depends more on your mix ratio than square footage, so estimate by the bag or batch count you need. Order by the cubic yard and round up slightly, since running short mid pour on a Bangor jobsite in October means waiting on a second delivery before the ground freezes.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Bangor Sand Delivery

Bangor Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Very happy with the ease of ordering. Delivery went exactly as planned. Garden soil looks great and couldn’t be happier.

One cubic yard of sand covers about 324 square feet at a 1 inch depth, or roughly half that at 2 inches, which is the typical range for paver bedding and joint work. For mortar mixing, the quantity depends more on your mix ratio than square footage, so estimate by the bag or batch count you need. Order by the cubic yard and round up slightly, since running short mid pour on a Bangor jobsite in October means waiting on a second delivery before the ground freezes.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Bangor Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Sand pairs naturally with crushed stone or gravel as a paver base system, with the stone doing the structural work and the sand leveling the surface. If you are mixing mortar, you will also want your stone or brick on hand before delivery so the sand does not sit exposed to rain. Some Bangor crews are shifting to chip stone for paver bedding since it will not pump the way sand can under freeze thaw cycling.

Map of the sand delivery area around Bangor, Maine

Service area

Areas we deliver sand in Bangor, Maine

Mulch Mound Pro Tip

Mason sand and paver bedding sand can look identical but behave differently once wet. For mortar mixing, keep the pile covered if rain is coming, since a wet Bangor fall can turn a workable mix into a soupy one fast. If you are bedding pavers, screed it dry and compacted before laying stone, wet sand compacts unevenly and telegraphs bumps through the finished surface.

Mulch Mound Pro Tip

A common mistake on paver jobs here is skipping edge restraints and relying on the sand joints alone to hold everything in place. With Bangor's freeze thaw cycles, unrestrained pavers walk outward over a few winters as the sand base heaves and settles. Set plastic or metal edging before you screed the bedding layer, it costs little time and saves a re-lay in three or four years.

Mulch Mound Pro Tip

If your project needs both a paver base and bedding sand, order the crushed stone base material at the same time as the sand delivery to save a second trip and a second cleared spot on your property. Sand settles and compacts more than people expect, so a slightly larger order than your calculator suggests avoids a mid project shortfall, especially once hardscape season gets busy from May through September.

Working With Sand in Bangor

Bangor sits on silt loam, which drains slower than sandy soil and holds moisture into the shoulder seasons. That makes a clean, well drained bedding layer under pavers or steps more important here than in sandier ground further south. Sand also gets used for mortar mixing on the brick and stone work common in the older parts of the city. With frost reaching deep into zone 5a ground, a proper sand base under hardscaping helps resist the heaving that comes with Bangor winters.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as mason sand for mortar work?

Yes, this is washed and finely screened natural sand, the fine uniform grade masons use for mortar and tuckpointing. It is finer and more consistent than concrete sand, which is what makes it workable for mortar mixes and paver joint filling.

Answer

How many cubic yards do I need for a 400 square foot patio?

At a 1 inch bedding depth, one cubic yard covers about 324 square feet, so a 400 square foot patio needs roughly 1.25 cubic yards. If you are going to a 2 inch depth for a heavier paver system, plan on about 2.5 cubic yards to be safe.

Answer

When is the best time to install a paver patio in Bangor?

Spring through fall is prime hardscape season here, once the ground has thawed past last frost around May 9 and before the first hard freeze near October 7. Working outside that window means fighting frozen or waterlogged silt loam subgrade, which makes proper base compaction difficult.

Answer

Where will the sand be placed on my property?

We place the load in one spot, so pick a flat, accessible area near your driveway or work site before delivery day, which is scheduled at checkout. Make sure the spot can handle truck access, since narrow or steep driveways around some of Bangor's older neighborhoods can limit where a full load can be dropped.

Answer

Should I use sand or chip stone under my pavers?

Sand has been the traditional choice for paver bedding, but many crews are now shifting to clean chip stone because it does not pump or shift under freeze thaw cycling the way sand can. Sand still works well for joint filling and is essential for mortar mixing, so the right choice depends on which part of the job you are doing.

More delivery around Bangor, Maine

All Bangor, Maine landscape supply