About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I have ordered twice now, a pleasure to deal with, easy and fast delivery, beautiful mulch!

One cubic yard of this fill dirt covers about 54 square feet at a 6 inch depth, and typical installs run 6 to 12 inches depending on how much grade you need to build up. For a low spot or backfill area, measure the length and width in feet, decide your depth, and that gives you the volume to order in cubic yards. Bigger jobs like raising a full yard section or backfilling a pool wall usually run several yards once you account for compaction.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Bend Fill Dirt Delivery

Bend Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I have ordered twice now, a pleasure to deal with, easy and fast delivery, beautiful mulch!

One cubic yard of this fill dirt covers about 54 square feet at a 6 inch depth, and typical installs run 6 to 12 inches depending on how much grade you need to build up. For a low spot or backfill area, measure the length and width in feet, decide your depth, and that gives you the volume to order in cubic yards. Bigger jobs like raising a full yard section or backfilling a pool wall usually run several yards once you account for compaction.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Bend Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs around Bend finish with a cap of topsoil once the fill is compacted, especially anywhere grass or plants need to establish in that sandy base. If the area is going to see foot traffic or drainage, a layer of crushed gravel on top of the fill can help before topsoil or sod goes down. Compaction equipment rental is worth asking about locally if you're placing more than a couple yards.

Map of the fill dirt delivery area around Bend, Oregon

Service area

Areas we deliver fill dirt in Bend, Oregon

Mulch Mound Pro Tip

Fill dirt is structural, not a growing medium, so don't skip compaction just because the area looks flat. Place it in lifts of 6 to 8 inches and compact each one before adding the next, whether with a plate compactor or hand tamper for smaller areas. Skipping this step is the number one reason people see sinking or soft spots a year later, especially in loose volcanic soil that doesn't self-compact the way heavier clay soils do.

Mulch Mound Pro Tip

The most common mistake with fill dirt is treating it like topsoil and planting straight into it. It has no nutrient value and compacts too dense for roots to push through easily. Always cap fill with 4 to 6 inches of real topsoil before seeding, sodding, or planting anything, and keep that separation in mind when you're ordering both materials for the same job.

Mulch Mound Pro Tip

If your project needs both fill and topsoil, order them as separate deliveries rather than trying to blend one material to do both jobs. It's more efficient to compact fill fully first, check your grade, then bring in topsoil once you know exactly how much cap depth you need. This avoids over ordering topsoil early and wasting material that never gets used.

Grading and Filling in Bend

Bend sits on sandy volcanic soil that drains fast and shifts more than people expect once you start digging near a foundation or pool wall. That loose native ground is part of why so many projects here need fill brought in rather than reused, since the excavated soil often doesn't compact well on its own. This fill dirt is meant to be compacted in place to build a stable base, not to feed plants. With elevation over 3600 feet and a short frost free window between June and September, most fill projects here get scheduled for the warmer months when the ground is workable and dry.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level my whole backyard in Bend?

Yes, fill dirt is the standard material for raising low spots and leveling grade before anything else goes down. Because it's a structural material, plan to compact it in 6 to 8 inch lifts as you build up height, and cap the finished grade with topsoil if you want grass or plants to establish on top.

Answer

How many cubic yards do I need to raise a 200 square foot area by 6 inches?

At 54 square feet of coverage per cubic yard at 6 inches deep, a 200 square foot area needs roughly 3.7 cubic yards. Round up and add a bit extra for compaction settling, so ordering 4 yards gives you a safer margin without leaving you short mid-project.

Answer

What time of year is best to bring in fill dirt in Bend?

Fill dirt itself isn't seasonal, it's driven by your project timeline, but Bend's window between the last frost around June 5 and first frost near September 12 gives you the most workable ground for compacting and grading. Working outside that window means dealing with frozen or saturated soil that's harder to compact properly.

Answer

Where does the truck place the fill dirt on delivery day?

The truck dumps the load at a location you designate that it can safely access, usually a driveway or open area near where you're working. Make sure the path is clear of low branches, tight turns, or parked cars, and let us know ahead of time if access is limited so the delivery goes smoothly.

Answer

Should I get fill dirt or topsoil for backfilling around my foundation?

Fill dirt is the right choice for backfill since it's meant to be compacted into a stable structural base, while topsoil is a growing medium that isn't dense enough for that job. Use fill dirt for the bulk of the backfill and cap the top few inches with topsoil only if grass or plants need to grow over it.

More delivery around Bend, Oregon

All Bend, Oregon landscape supply