We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wan...
Read full review
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I compared it to competitors and I will definitely be becoming back.
Complete Your Outdoor Project
Mason sand pairs with mortar mix, flagstone, and pavers on most Centennial patio and wall jobs. Some crews are shifting paver joints to clean chip stone instead of sand since it won't pump out under freeze thaw cycles, worth asking about if that's your project. For pool bases, a compacted road base underneath the sand layer gives you a stable, level start.
At 5837 feet, Centennial's dry air pulls moisture out of mortar mixes faster than at sea level, so mix in smaller batches and keep your mason sand covered between uses. If it dries out before you spread it, workability drops and you'll end up adding water on the fly, which weakens the final mortar bond. Keep a tarp over the pile between work sessions, especially on windy spring days.
A common mistake on clay soil sites is skipping a compacted base layer under sand for paver joints or pool decks. Clay shifts with moisture and freeze thaw, and sand alone won't stabilize a soft subgrade. Always compact your base material first, then use the sand for its actual job, filling joints or leveling the top inch, not correcting a soft foundation underneath.
If you're doing paver joints, ask about chip stone before you commit to sand, since chip stone locks in place and resists the pumping and washout that sand joints can suffer during heavy spring rain or snowmelt runoff. Mason sand is still the right call for mortar mixing and pool base work, so many jobs end up ordering both materials rather than one or the other.
Working With Sand in Centennial
Centennial sits on heavy clay at 5837 feet, which is exactly why mason sand matters for drainage layers under patios and pool decks, since clay alone won't let water move. Hardscape crews here rely on it for mortar mixing and joint fill on the flagstone and paver patios common in this area. With dry high altitude air and big freeze thaw swings between the October and May frost dates, a properly bedded and jointed installation matters more here than in milder climates. It's not a mulch or a soil amendment, it's a build material for structure.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.