About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Online ordering was really simple and I liked the transparent pricing.

Fill dirt is sold by the cubic yard, and one yard covers about 54 square feet at a 6 inch depth. Most structural fill jobs run 6 to 12 inches deep, so a small low spot might only need a yard or two, while backfilling around a foundation or pool wall can run considerably higher. Measure the length and width of the area you're raising and the depth you need to get to grade, then work backward from the 54 square foot figure.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Claremont Fill Dirt Delivery

Claremont Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Online ordering was really simple and I liked the transparent pricing.

Fill dirt is sold by the cubic yard, and one yard covers about 54 square feet at a 6 inch depth. Most structural fill jobs run 6 to 12 inches deep, so a small low spot might only need a yard or two, while backfilling around a foundation or pool wall can run considerably higher. Measure the length and width of the area you're raising and the depth you need to get to grade, then work backward from the 54 square foot figure.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Claremont Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Fill dirt is a structural base, not a growing medium, so most jobs finish with a few inches of topsoil on top wherever grass, beds, or gardens are going in. If you're backfilling near a foundation or pool, a layer of gravel underneath can help with drainage before the fill goes in. Mulch or stone finishes off any beds once the topsoil cap is graded and settled.

Mulch Mound Pro Tip

Fill dirt is not something you dump and walk away from. Place it in lifts of 6 to 8 inches and compact each layer before adding the next, otherwise the pile settles unevenly over months or even years as it dries and shifts. This matters even more on Claremont's mixed sandy loam sites where drainage varies lot to lot. A rented plate compactor for a day costs far less than repairing a sunken patio slab or cracked walkway later.

Mulch Mound Pro Tip

The most common mistake we see is people trying to grow grass or plants directly in fill dirt. It's subsoil, not topsoil, and it's usually low in organic matter and structured for compaction, not root growth. Always cap finished fill with 4 to 6 inches of real topsoil before seeding or planting. Skipping this step means thin, patchy grass no matter how much fertilizer gets used afterward.

Mulch Mound Pro Tip

If you're raising a large area, it's worth pairing fill dirt with a delivered load of topsoil in the same order rather than doing it in two separate trips. Since fill is priced and delivered by the cubic yard just like topsoil, planning both quantities together at once often means fewer delivery trips and less time your yard is torn up mid project.

Grading and Filling in Claremont

Claremont's sandy loam drains fast on its own, but plenty of yards here still have low pockets left over from old foundation work or grading near the mills along the river. Fill dirt is what you bring in to raise those spots before anything else happens, not to grow in. With frost showing up by late September and the ground freezing not long after, getting fill placed and compacted before the first hard freeze matters more here than in milder climates. Once it's settled and capped with topsoil, the sandy loam base actually helps water move away from the new grade instead of pooling on it.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level a low spot in my backyard in Claremont?

Yes, that's one of the most common uses for it. Place it in 6 to 8 inch lifts and compact each layer as you go, since uncompacted fill will keep settling for months. If grass or plants are going on top, finish with a topsoil cap rather than seeding directly into the fill.

Answer

How many cubic yards of fill dirt do I need for a small low area?

One cubic yard covers about 54 square feet at a 6 inch depth. So a 100 square foot low spot filled 6 inches deep needs roughly 2 cubic yards. For deeper fills up to 12 inches, plan on closer to double that amount for the same footprint.

Answer

Is there a bad time of year to bring in fill dirt around Claremont?

Fill dirt itself isn't seasonal since it's a project based material, not a planting one. That said, with first frost typically hitting late September here, it's smart to get fill placed and compacted before the ground starts freezing, so it settles properly instead of freezing in loose lifts.

Answer

Where does the delivery truck put the fill dirt, and what do I need to prepare?

The truck dumps the load at an accessible spot you designate, ideally as close to the work area as the driveway or yard allows since fill dirt is too heavy to move far by hand easily. Clear vehicles and obstacles from the path beforehand, and delivery timing is set during checkout.

Answer

What's the difference between fill dirt and topsoil for my project?

Fill dirt is subsoil used to raise grade or backfill structurally, it's not meant for growing anything. Topsoil is the finishing layer with organic matter that supports grass and plants. Most raising projects use fill dirt to build up the bulk of the depth, then cap it with a few inches of topsoil where planting happens.

More delivery around Claremont, New Hampshire

All Claremont, New Hampshire landscape supply