So Easy!
So Cheap!
So doing this again next year!

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
Very happy with the ease of ordering. Delivery went exactly as planned. Garden soil looks great and couldn’t be happier.
The website to order is super easy to use. Pick a mulch, date/time/driveway location of the delivery and that’s it. A few days later there was a ni...
Read full review
The website to order is super easy to use. Pick a mulch, date/time/driveway location of the delivery and that’s it. A few days later there was a nice mound of mulch in my driveway. Great service - just as promised.
Complete Your Outdoor Project
Most paver jobs pair this sand with edge restraints and a base layer of crushed gravel underneath, and mortar work usually means ordering portland cement alongside it. If you are leveling a paver base rather than filling joints, some crews in this area are switching to clean chip stone instead since it will not pump or wash out the way sand can under freeze thaw cycles.
Service area
Areas we deliver sand in Dayton, Ohio
- Bellbrook, Ohio
- Centerville, Ohio
- Clayton, Ohio
- Englewood, Ohio
- Fairborn, Ohio
- Franklin, Ohio
- Germantown, Ohio
- Huber Heights, Ohio
- Lebanon, Ohio
- Miamisburg, Ohio
- Oakwood, Ohio
- Riverside, Ohio
For paver bedding in the Dayton area, ask yourself whether you actually need sand or whether chip stone is the better call. Sand pumps up through joints over time, especially with our freeze thaw cycles, and can leave your pavers looking uneven within a couple seasons. Mortar work is different, this sand's fine, uniform grain is what you want there. Match the material to the job rather than defaulting to sand out of habit.
Do not order sand and let it sit uncovered through a Dayton winter if you are not using it right away. Rain and snowmelt turn a loose pile into a compacted, partially frozen mass that is a pain to work with in spring. If you are buying ahead of season, tarp the pile and keep it somewhere it can drain, or better yet time your delivery closer to your actual start date.
If you are doing both mortar mixing and paver joint work on the same project, order the volumes separately rather than guessing one combined total. Mortar sand consumption depends on your mix ratio with cement, while joint fill depends on paver spacing and patio size. Splitting the estimate keeps you from running short mid job or paying to haul away a large unused surplus.
Working With Sand in Dayton
Dayton sits on heavy clay soil, which means most sand orders here are for hardscape work rather than soil amendment, since clay does not drain well enough to make sand a smart mixing additive. Masons across the Miami Valley use this sand for mortar on brick and block work, a trade that stays busy given how much of the area's older housing stock runs to brick construction. Pool installers and paver crews also lean on it for base leveling work before the hardscape season gets going in spring. With a growing zone of 6a and a real winter, timing sand delivery around the frost dates matters more than it does further south.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.