I have ordered twice now, a pleasure to deal with, easy and fast delivery, beautiful mulch!

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
Highest compliments. Great driver.
Website is easy to navigate. Just a seamless process. 5 stars!!
I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).
Complete Your Outdoor Project
Mason sand pairs naturally with mortar mix and brick or block for repair jobs around Decatur's older housing stock. For paver projects, many crews now bring in chip stone alongside the sand, using sand for the bedding layer and chip stone for the joints since it resists washout better in this area's rainfall pattern. If you are doing a pool base, a layer of coarser bedding material underneath the sand helps with stability on silt loam soil.
Service area
Areas we deliver sand in Decatur, Illinois
Mason sand mixes best when it is slightly damp, not bone dry and not soaked. In Decatur's humid summers the pile will often hold enough moisture on its own, but if you are working in a dry spell, mist it lightly before mixing mortar. Overly dry sand makes mortar crumbly and hard to spread evenly, especially on brick repair jobs where a consistent joint line matters for appearance and water resistance.
A common mistake is using mason sand for paver joint fill and expecting it to stay put through a Decatur spring. The area's heavier rain events wash fine sand out of joints over a season or two, which is why more contractors are switching to angular chip stone for that specific use. Save the mason sand for mortar work and pool bases where it is not exposed to direct runoff, and use chip stone where drainage and joint stability matter most.
If your project involves both mortar work and paver joints, order the sand and the chip stone together so you only pay for one delivery instead of two separate trips. Stockpile the sand on a tarp or plywood rather than directly on silt loam soil, since the soil here holds moisture and will contaminate the bottom of the pile with clay and silt if left in contact for more than a few days.
Working With Sand in Decatur
Decatur sits on silt loam that holds water and turns soft in spring, which is exactly why sand matters here for drainage and workability in mortar and paver joints. With the last frost typically in early May and the first frost around October 11, most masonry and hardscape work gets compressed into a six month window, so having material staged and ready matters. Contractors mixing mortar for brick repair around older Soy City neighborhoods rely on the fine, uniform grain of mason sand rather than coarser concrete sand, since it makes the mix workable in cooler spring temperatures. For paver joints, some crews are shifting to chip stone instead, since sand joints can wash out during Decatur's heavier spring rains.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.