About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Fill dirt is sold by the cubic yard, and one yard covers about 54 square feet at a 6 inch depth. Most structural fill jobs run 6 to 12 inches deep, so a 200 square foot low spot at 6 inches needs roughly 4 yards, and doubling the depth roughly doubles the yardage. Measure the low area in square feet first, then match it to the depth you actually need before ordering.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Dickinson Fill Dirt Delivery

Dickinson Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Fill dirt is sold by the cubic yard, and one yard covers about 54 square feet at a 6 inch depth. Most structural fill jobs run 6 to 12 inches deep, so a 200 square foot low spot at 6 inches needs roughly 4 yards, and doubling the depth roughly doubles the yardage. Measure the low area in square feet first, then match it to the depth you actually need before ordering.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Dickinson Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs around Dickinson finish with a cap of topsoil once the grade is where it needs to be, since fill alone will not support grass or plantings. If the area is going under a patio or shed pad, a compactable base material on top of the fill works better than topsoil. Either way, plan the finish layer before the fill truck shows up so the total height comes out right.

Mulch Mound Pro Tip

Compact every 6 to 8 inch lift before adding the next one, especially in Dickinson's clay loam where the native ground already drains slowly. Skipping compaction means the fill settles unevenly over the following year or two as it saturates and dries with the seasons, and you end up with a dip right where you thought the ground was solved. A plate compactor rented for a day costs far less than redoing the grading later.

Mulch Mound Pro Tip

The most common mistake on fill jobs here is capping with fill dirt itself instead of topsoil and expecting grass to take. Fill dirt is subsoil with the organic matter screened out, so nothing establishes well in it long term. Always finish with 4 to 6 inches of actual topsoil on top once your grade is set, even if it means ordering two materials instead of one.

Mulch Mound Pro Tip

If you are filling a large low area, order slightly more than your calculated volume rather than less, since compaction reduces the finished depth by 10 to 20 percent from loose volume. Running short mid project means a second delivery and a second trip charge, while a modest overage just becomes extra base for the topsoil layer.

Grading and Filling in Dickinson

Dickinson sits at 17 feet of elevation with clay loam soil underneath, which means water does not move through the ground fast and low spots stay soggy long after rain moves off the coast. Fill dirt is the tool for correcting that, raising grade around foundations, sheds, and pool equipment pads so runoff has somewhere to go. Because the native soil here is already dense clay loam, any fill you bring in should be compacted the same way, in lifts, or it will settle unevenly against the existing ground. This is not material for planting directly into, it is the structural layer that goes underneath.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I plant grass or shrubs directly in fill dirt in Dickinson?

No, fill dirt is subsoil meant for structural grading, not growing. Cap it with 4 to 6 inches of topsoil once your grade is set, then plant into that layer. Planting straight into fill dirt usually fails because the organic matter and nutrients have been screened out.

Answer

How many cubic yards do I need to raise a 300 square foot low spot by 8 inches?

At 54 square feet per yard for a 6 inch depth, 300 square feet at 8 inches works out to roughly 7 to 8 cubic yards. Measure your actual square footage and depth first since low spots are rarely perfectly even, and round up slightly to account for compaction.

Answer

Does fill dirt need to be installed a certain way given Dickinson's clay soil?

Yes, place it in 6 to 8 inch lifts and compact each one before adding the next. Dickinson's clay loam subsoil already drains slowly, so uncompacted fill on top of it will settle unevenly over time as it wets and dries with the seasons, leaving low spots right where you tried to fix them.

Answer

Where will the truck place the fill dirt on delivery day?

The load goes wherever your driveway or curb access allows, at the spot you specify when scheduling. Delivery windows are set at checkout rather than promised in advance, so clear the access path and have a plan for moving material from the drop point to the work area.

Answer

Should I order fill dirt or topsoil for my project?

If you are raising grade, backfilling around a foundation or pool, or building up ground before finishing work, fill dirt is the right structural material. Topsoil comes after, as the finish layer where anything needs to grow. Most grading jobs in Dickinson end up using both, fill underneath and topsoil on top.

More delivery around Dickinson, Texas

All Dickinson, Texas landscape supply