
How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wan...
Read full review
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I compared it to competitors and I will definitely be becoming back.
Ordered Dirt. Received Dirt. Would Buy Again.
Complete Your Outdoor Project
Sand pairs naturally with paver base or crushed rock underneath it, and with polymeric jointing sand or chip stone on top depending on what you're finishing. If you're pouring mortar for block or brick work, you'll also want portland cement on hand before the sand gets delivered. Pool contractors typically order sand alongside a top layer of decorative aggregate for the deck surround.
Service area
Areas we deliver sand in Fairfield, California
Because Fairfield's clay soil doesn't drain well, don't skip a compacted base layer under your sand if you're building a paver patio or walkway. Sand alone over clay will hold moisture and shift seasonally even without freeze cycles. Lay crushed rock first, compact it, then screed your sand layer on top. This two-layer approach matters more here than in sandier soil regions, since the clay underneath is doing none of the drainage work for you.
A common mistake on pool base jobs is troweling sand too thin near the walls, where it settles unevenly once water weight sits on it for a season. Keep your depth consistent at 1 to 2 inches across the entire base, including the edges, and dampen the sand slightly before troweling so it holds its shape instead of sliding as you work.
If you're doing paver joints, consider whether chip stone might serve you better than sand, since sand joints can pump out under foot traffic and need refilling within a year or two. Sand still makes sense for mortar mixing and pool bases where its fine, uniform grain is the actual advantage. Ordering just enough for the job you're doing, rather than a generic all-purpose yard, saves you from buying material that isn't suited to the task twice.
Working With Sand in Fairfield
Fairfield sits on clay soil that holds water and drains slowly, which is exactly why sand gets used as a buffer layer under patios, pool decks, and paver walkways here. With Zone 9b winters staying mild and frost only showing up between December and February, hardscape crews keep working most of the year without worrying about ground heave cracking a base. The finer grain in mason sand also makes it the right call for mortar work on the block and brick construction common in older Fairfield neighborhoods. It's less suited as loose paver bedding on its own, since it can pump and shift under joint pressure over time.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.