About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Easy to order, great service, and great product. We enjoy the final look of a very neglected beds we inherited!

Fill dirt is sold by the cubic yard, and one yard covers about 54 square feet at a 6 inch depth. Most structural jobs, like raising a low yard or backfilling around a foundation, run 6 to 12 inches deep, so a 200 square foot low spot at 8 inches needs roughly 5 cubic yards. Measure the actual area you're filling, not the whole yard, since fill dirt is heavy and overordering adds up.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Fort Mill Fill Dirt Delivery

Fort Mill Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Easy to order, great service, and great product. We enjoy the final look of a very neglected beds we inherited!

Fill dirt is sold by the cubic yard, and one yard covers about 54 square feet at a 6 inch depth. Most structural jobs, like raising a low yard or backfilling around a foundation, run 6 to 12 inches deep, so a 200 square foot low spot at 8 inches needs roughly 5 cubic yards. Measure the actual area you're filling, not the whole yard, since fill dirt is heavy and overordering adds up.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Fort Mill Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs finish with a topsoil cap, since fill dirt is a structural base and not something anything will grow in. If you're backfilling near a pool or patio, a layer of crushed stone underneath the fill can help with drainage before you build up. Pair with topsoil if grass, beds, or sod are going in on top.

Mulch Mound Pro Tip

Fill dirt is not something you dump and walk away from. Place it in 6 to 8 inch lifts and compact each one before adding the next, or you'll be looking at sunken spots for years as it settles unevenly, especially over Fort Mill's clay which holds moisture and shifts with wet and dry cycles. A rented plate compactor for a weekend job is worth it if you're filling more than a couple yards.

Mulch Mound Pro Tip

The most common mistake on fill dirt jobs is skipping the topsoil cap and trying to seed or sod directly into it. Fill dirt is subsoil, it has none of the organic matter or structure that grass or plants need. Always finish with 4 to 6 inches of topsoil on top once your fill has settled and compacted, especially before spring planting windows around the March 15 last frost.

Mulch Mound Pro Tip

If you're filling a large low area, order fill dirt for the bulk of the depth and save topsoil for just the top few inches, since topsoil costs more and you don't need the extra organic content buried under a foot of fill. This layering approach gets you a stable base without paying for growing medium where nothing will grow anyway.

Grading and Filling in Fort Mill

Fort Mill sits on red clay that already drains poorly, so low spots and areas around new construction tend to hold standing water after a storm off the Catawba. Fill dirt is the structural fix, it builds elevation and stable grade before anything else goes on top. With the region's growth pushing new pools, additions, and driveway extensions through older lots near the Greenway, fill dirt is one of the most requested materials for leveling ground before a final topsoil or sod layer.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level my whole backyard in Fort Mill?

Yes, fill dirt is the right material for raising grade across a yard, especially where our red clay holds water and creates low spots. Plan on compacting it in lifts as you build up, and cap the final few inches with topsoil if you want grass or beds on top.

Answer

How many cubic yards of fill dirt do I need for a 300 square foot low spot?

At a 6 inch depth, one cubic yard covers about 54 square feet, so 300 square feet needs roughly 5.5 cubic yards. If you're filling deeper, say 10 inches, plan closer to 9 to 10 cubic yards since coverage drops as depth increases.

Answer

When is the best time to bring in fill dirt before I build on top of it?

Fill dirt is project driven, not seasonal, so timing depends on your build schedule rather than the calendar. That said, avoid filling right before heavy rain since compaction works better on drier clay, and give it time to settle before laying sod or hardscape on top.

Answer

Where will the fill dirt be placed when it's delivered?

The load gets dumped at a spot you choose that's accessible to a dump truck, typically your driveway or as close to the work area as the truck can safely reach. Clear the path beforehand and have a plan for moving it if the drop spot isn't right where you're filling.

Answer

Should I get fill dirt or topsoil for backfilling around my new pool?

Fill dirt is the right choice for the bulk of the backfill since it's a structural material meant to be compacted in lifts. Save topsoil for the final surface layer if grass or landscaping is going in around the pool deck afterward.

More delivery around Fort Mill, South Carolina

All Fort Mill, South Carolina landscape supply