About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

One cubic yard of this sand covers about 324 square feet at a 1 inch depth, so a small patio or walkway project rarely needs more than a yard or two. For mortar mixing or paver joint work, most Franklin jobs run in the 1 to 2 inch range depending on whether you're bedding or just filling joints. Measure your square footage first, then decide whether you're doing a thin joint fill or a fuller bedding layer before ordering.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Franklin Sand Delivery

Franklin Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

One cubic yard of this sand covers about 324 square feet at a 1 inch depth, so a small patio or walkway project rarely needs more than a yard or two. For mortar mixing or paver joint work, most Franklin jobs run in the 1 to 2 inch range depending on whether you're bedding or just filling joints. Measure your square footage first, then decide whether you're doing a thin joint fill or a fuller bedding layer before ordering.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Franklin Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most Franklin hardscape jobs pair this sand with paver base stone or crushed gravel underneath it, since sand alone won't carry the load on Middle Tennessee's clay-influenced silt loam. If you're mixing mortar for a stone or brick project near the historic district, you'll also want cement on hand. Some crews are switching to chip stone for paver bedding since it doesn't pump the way sand can under freeze thaw cycles.

Map of the sand delivery area around Franklin, Tennessee

Service area

Areas we deliver sand in Franklin, Tennessee

Mulch Mound Pro Tip

Mason sand is easy to overwater when mixing mortar, since it holds moisture longer than coarser concrete sand does. In Franklin's humid spring and summer months, let a test batch sit for a few minutes before judging workability, because the sand's moisture content changes how much water your mix actually needs. Mixing it dry first, then adding water gradually, gives you more control than adding sand to a wet mix.

Mulch Mound Pro Tip

If you're using this for paver joints, avoid installing during or right after Franklin's heavier spring rain stretches. Wet sand won't sweep into joints cleanly and tends to clump on the surface instead of settling down between the pavers. Wait for a dry stretch, even a day or two, and the joint fill goes noticeably faster and holds up better once compacted.

Mulch Mound Pro Tip

A growing number of Franklin hardscape crews are shifting away from sand for paver bedding and toward clean chip stone, since sand can pump up through joints during freeze thaw cycles common here from December through February. Mason sand still makes sense for mortar and joint filling, but if you're bedding a patio meant to last, ask your contractor whether chip stone fits the plan better before you order a full yard.

Working With Sand in Franklin

Franklin sits on silt loam that drains reasonably well but still turns soft and sticky after the region's heavy spring rains, which is exactly when most hardscape crews start their season. Mason sand gives you a stable, uniform bedding layer or mortar mix that does not depend on the native soil's behavior underneath it. Around the historic district, where a lot of stonework and brick repair mimics older construction methods, this finer sand is what makes mortar workable enough to match old-style joints. For paver joint filling on patios near downtown, it locks in tighter than coarser sand once it's swept and settled.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as concrete sand?

No, this is mason sand, which is finer and more uniformly graded than concrete sand. That finer grain is what makes mortar workable enough to spread and set properly. Concrete sand is coarser and better suited to structural mixes, not mortar joints or fine paver work, so using the wrong one can leave your mortar too stiff or too loose.

Answer

How many cubic yards do I need for a paver patio?

For joint filling alone, you'll use far less than the coverage rate of 324 square feet per inch suggests, since joints are narrow gaps rather than a full surface layer. For mortar mixing on a stone wall or walkway, estimate based on your mix ratio and total wall or joint area. Most residential patio jobs in Franklin use well under a full cubic yard for joints alone.

Answer

When's the best time to schedule a hardscape project in Franklin?

Spring through fall is peak hardscape season here, running roughly after the last frost around April 10 through before the first frost around October 26. Mortar work in particular needs mild, dry conditions to cure properly, so avoid scheduling right before a hard freeze or during Franklin's wettest spring stretches if you can help it.

Answer

Where will the sand be placed on delivery day?

We place the load as close to your work area as truck access allows, typically a driveway or curbside spot. Let us know ahead of time if your property has tight access, like the narrower lots common near Historic Downtown Franklin, so we can plan the drop accordingly.

Answer

Should I use sand or chip stone under my pavers?

That depends on your project. Sand still works fine for joint filling and mortar mixing, but many contractors now prefer clean chip stone for paver bedding since it does not pump up through joints during freeze thaw cycles the way sand can. If you're unsure, ask your installer which base material they're planning to use before you order.

More delivery around Franklin, Tennessee

All Franklin, Tennessee landscape supply