I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!
Complete Your Outdoor Project
Most paver and patio jobs around Fremont pair this sand with a base layer of crushed rock or road base to handle the adobe clay underneath, then use the sand for the leveling course and joint fill on top. If you are mixing mortar, you will also want your cement and lime on hand before the load arrives so you are not stopping mid batch. Pool base jobs sometimes call for a bit of extra sand held in reserve for touch ups after the first season of settling.
Service area
Areas we deliver sand in Fremont, California
Adobe clay under a paver base does not drain the way sandy soil does, so a lot of longtime Fremont installers now use clean chip stone instead of sand for the bedding layer since it will not pump or migrate when the clay swells with winter rain. Save the mason sand itself for mortar mixing and joint fill where its fine, uniform grain actually matters, rather than as a bedding layer on top of clay.
A common mistake on pool base and paver jobs is mixing mortar sand with leftover concrete sand from a prior job. The grain sizes do not match, and you end up with a mortar mix that is harder to trowel and cures unevenly. Keep this material in its own covered pile, even a tarp over a small mound keeps out debris and prevents it absorbing extra moisture before your batch.
If your project spans mortar work and paver joint fill, order both from the same cubic yard delivery rather than splitting it into two smaller loads. It cuts down on delivery trips and keeps your material consistent across the job, which matters more than people expect when color and grain uniformity show up in a finished mortar joint.
Working With Sand in Fremont
Fremont sits on adobe clay that swells and cracks with the seasonal wet and dry cycle, which is one reason builders prefer a clean sand base under pavers and mortar work rather than relying on native soil to stay stable. At 56 feet elevation with mild zone 9b winters, hardscape crews here work close to year round, so mason sand demand stays steady rather than tied to a short window. A lot of the patio and walkway work near the Silicon Valley tech corridor calls for tight, uniform joints, and this sand's fine grain is what gets you there. Some crews are shifting to chip stone for paver bedding since it will not pump through adobe clay subgrade the way sand can under repeated wet seasons.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.