About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Very happy with the ease of ordering. Delivery went exactly as planned. Garden soil looks great and couldn’t be happier.

One cubic yard of this sand covers about 324 square feet at a 1 inch depth, and most mortar or bedding applications only need 1 to 2 inches. For a typical patio or paver joint job in Fremont, figure your square footage first, then divide by 324 for a 1 inch layer or by roughly 162 for 2 inches, and order in full cubic yard increments since that is how it is sold.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Fremont Sand Delivery

Fremont Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Very happy with the ease of ordering. Delivery went exactly as planned. Garden soil looks great and couldn’t be happier.

One cubic yard of this sand covers about 324 square feet at a 1 inch depth, and most mortar or bedding applications only need 1 to 2 inches. For a typical patio or paver joint job in Fremont, figure your square footage first, then divide by 324 for a 1 inch layer or by roughly 162 for 2 inches, and order in full cubic yard increments since that is how it is sold.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Fremont Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most jobs that call for this sand also need a base layer of crushed stone underneath it for drainage, especially in Fremont's clay loam where standing water is common after spring rain. If you're setting pavers, pair it with edge restraints and jointing sand or consider chip stone as the bedding layer instead. Mortar jobs typically also need cement delivered around the same time.

Map of the sand delivery area around Fremont, Ohio

Service area

Areas we deliver sand in Fremont, Ohio

Mulch Mound Pro Tip

Mason sand for mortar mixing needs to stay dry until you're ready to mix, especially in Fremont where humidity swings can clump a pile overnight. Cover it with a tarp weighted at the edges rather than just draping it loosely, because wind off open ground here will lift a light cover and let rain in. Wet sand throws off your mortar ratio and makes the mix inconsistent from batch to batch on the same job.

Mulch Mound Pro Tip

A common mistake on paver jobs is using mason sand as the bedding layer under the pavers themselves instead of just in the joints. It's finer than concrete sand and migrates more under load and freeze thaw, which shows up as uneven pavers a season or two later. Save the mason sand for joints and mortar, and use a coarser bedding material for the layer pavers actually sit on.

Mulch Mound Pro Tip

If you're doing both a mortar job and paver joints on the same project, order the full amount as one delivery rather than two smaller ones, since a single cubic yard load covers a surprising amount of joint work once you calculate it at a 1 inch fill depth. Buying in one trip also means one less delivery window to schedule around your work day.

Working With Sand in Fremont

Fremont sits on clay loam that holds water and stays heavy through spring thaw, which is exactly the kind of ground that makes a clean, uniform bedding layer matter for patios and walkways near the Hayes Presidential Center and around town. Mason sand gives masons and DIYers a workable mix for mortar in a zone 6a climate where freeze thaw cycles between the October and May frost dates stress joints if the base isn't right. A lot of local hardscape work is shifting to chip stone under pavers because it locks in place and does not pump water up through joints the way sand can. Sand still earns its place for mortar work and pool base leveling where a finer material is what you actually want.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as mason sand or concrete sand?

This is mason sand, washed and finely screened, which is what you want for mortar mixing and paver joints. It's finer and more uniform than concrete sand, which is coarser and better suited to structural bedding. If your project calls for concrete work specifically, ask before ordering since the two are not interchangeable.

Answer

How many cubic yards do I need for a patio joint fill?

One cubic yard covers about 324 square feet at a 1 inch depth, but joint fill uses far less material than a full bedding layer since you're only filling narrow gaps between pavers. Measure your patio's total joint area rather than the whole surface, and you'll usually find a fraction of a cubic yard does the job.

Answer

When is the best time to schedule this for a hardscape project in Fremont?

Spring through fall is when most hardscape work happens here, and you'll want to work between the last frost around May 6 and the first frost around October 15 for anything involving mortar curing outdoors. Cold, wet ground in early spring can also make grading and prep harder given the local clay loam.

Answer

Can the truck get into a tight backyard or alley for delivery?

Delivery is scheduled at checkout where you'll specify the drop location, and the truck will place the load as close to that spot as access allows. Tight backyards or narrow alleys sometimes mean the material gets dropped in the driveway or front yard instead, so let us know about access constraints when you set up delivery.

Answer

Should I use sand or chip stone under my pavers?

For paver bedding, chip stone is increasingly the better choice since it locks together and does not pump water up through the joints the way sand can over time. Mason sand still works well for filling the joints themselves and for mortar mixing, so many jobs actually use both materials for different parts of the same project.

More delivery around Fremont, Ohio

All Fremont, Ohio landscape supply