About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

One cubic yard of this sand covers about 324 square feet at a 1 inch depth, and typical install depth runs 1 to 2 inches depending on whether you are setting mortar, filling paver joints, or building a pool base. For joint work on a standard patio, you often need less than you think since it is filling gaps, not covering an open surface. Measure your paver area and depth need first, then order by the cubic yard rather than guessing at bags.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Greenlawn Sand Delivery

Greenlawn Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

One cubic yard of this sand covers about 324 square feet at a 1 inch depth, and typical install depth runs 1 to 2 inches depending on whether you are setting mortar, filling paver joints, or building a pool base. For joint work on a standard patio, you often need less than you think since it is filling gaps, not covering an open surface. Measure your paver area and depth need first, then order by the cubic yard rather than guessing at bags.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Greenlawn Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most paver jobs in Greenlawn pair this sand with a compacted gravel base below and either paver edging or chip stone depending on the design. If you are mixing mortar for a stone wall near an older property, you will also want cement on hand before the load arrives. Pool base projects sometimes call for a geotextile fabric layer on top of the sand for stability.

Mulch Mound Pro Tip

For mortar work in this climate, keep the sand dry until you are ready to mix. Sandy loam ground in Greenlawn drains well but a rained-on pile still clumps and throws off your water ratio. Cover the pile with plastic sheeting between work sessions rather than tarping it loosely, a loose tarp lets moisture wick in from the edges and you will not notice until the mortar goes stiff on you.

Mulch Mound Pro Tip

A common mistake on paver jobs here is using this fine sand as bedding under the pavers instead of just in the joints. Bedding sand needs to be coarser and less uniform or it shifts and pumps out under freeze thaw cycles, which zone 7b sees plenty of. Save this grade for joint filling and mortar, and use a coarser material or chip stone for the base layer beneath the pavers themselves.

Mulch Mound Pro Tip

If you are doing both a paver patio and a mortared retaining wall on the same property, order the sand in one combined load rather than two separate deliveries. It is easier to stage one pile with a tarp divider than to schedule two trucks, and you avoid paying for a second delivery when the quantities would fit on one load anyway.

Working With Sand in Greenlawn

Greenlawn sits on sandy loam soil already, so this material is not fighting the native ground the way it might in heavier clay regions. That makes it a natural fit for hardscape work like patios and walkways near projects around John Gardiner Farm and similar older properties where pavers and stone walls are common. With a first frost around November 1 and last frost near April 3, most masonry and paver jobs get packed into a working season roughly April through October. Freeze thaw cycles in zone 7b winters make correct joint sand critical, loose or wrong grade sand will heave and gap by spring.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same sand people call mason sand?

Yes, this washed and finely screened sand is what is commonly called mason sand in some regions, and it is what you want for mortar mixing and paver joints. It is finer and more uniform than concrete sand, which is exactly what makes mortar workable and keeps paver joints packed tight instead of gapping over a season.

Answer

How much sand do I need for a paver patio in Greenlawn?

One cubic yard covers about 324 square feet at a 1 inch depth, but joint filling uses far less material than a full surface cover. For a typical patio, measure your paver area, figure roughly 1 inch of joint depth, and most residential patios need well under a full yard unless you are also doing a sand base layer.

Answer

When should I schedule sand delivery for a hardscape project?

Hardscape work in Greenlawn generally runs spring through fall, roughly April through October, between the last and first frost dates. Ordering sand right before you are ready to lay pavers or mix mortar keeps it clean and dry, since a pile sitting through a rainy stretch gets harder to work with.

Answer

Where will the sand be placed on delivery day?

The truck places the load wherever you specify, typically a driveway or a flat spot near your work area, since delivery is scheduled at checkout and you choose the location then. Make sure the access path is clear of low branches or tight turns, and put down a tarp first if you want to protect the surface underneath.

Answer

Should I use this sand or chip stone under my pavers?

For paver bedding specifically, chip stone is increasingly used instead of sand because it does not pump out from under the pavers over time, which sand can do with freeze thaw cycling. This sand is still the right choice for the joints between pavers and for any mortar work, just not necessarily the base layer beneath them.

More delivery around Greenlawn, New York

All Greenlawn, New York landscape supply