About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Ordered Dirt. Received Dirt. Would Buy Again.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, so a 300 square foot area built up 6 inches needs roughly 5.5 yards. For deeper fill, figure your cubic footage and divide by 27 to get yards, then add a bit extra since compaction will reduce the final volume. Most Groveland jobs raising a low yard or backfilling a foundation run somewhere between 6 and 12 inches deep.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Groveland Fill Dirt Delivery

Groveland Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Ordered Dirt. Received Dirt. Would Buy Again.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, so a 300 square foot area built up 6 inches needs roughly 5.5 yards. For deeper fill, figure your cubic footage and divide by 27 to get yards, then add a bit extra since compaction will reduce the final volume. Most Groveland jobs raising a low yard or backfilling a foundation run somewhere between 6 and 12 inches deep.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Groveland Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Fill dirt is a base material, not a finish, so most jobs cap it with a few inches of topsoil once the grade is set and anything needs to grow. If you are building up around a pool deck or patio, a layer of compactable base or gravel on top of the fill can help before pavers go down. Mulch or stone comes later, once the structural work underneath is done.

Mulch Mound Pro Tip

Groveland's sandy soil compacts differently than clay, it settles fast under weight but can wash out at the edges if left loose in Florida's heavy summer rain. Place fill in 6 to 8 inch lifts and compact each one with a plate compactor or hand tamper before adding the next. Skipping lifts and dumping it all at once is the number one reason people end up with a sunken yard a year later, especially near pools and foundations where load matters most.

Mulch Mound Pro Tip

Fill dirt is not a growing medium, it is subsoil with the organic matter screened out, so nothing will thrive planted directly into it. Cap any area where you want grass, beds, or trees with 4 to 6 inches of real topsoil after the fill is compacted and graded. This is especially important in Groveland since the native sandy soil already struggles to hold nutrients, and raw fill underneath makes that worse.

Mulch Mound Pro Tip

If you are filling a large area, it often makes sense to bring in fill dirt for the bulk of the depth and finish the top few inches with topsoil, rather than paying for topsoil all the way down. Fill dirt costs less per yard since it skips the screening and amendment that topsoil gets. Pair the two in the right order and you get a stable base without overspending on material that will just be buried anyway.

Grading and Filling in Groveland

Groveland sits at a modest 105 feet in elevation with sandy soil that drains well but does not hold a shape once you pile it up loose. That makes it easy to dig but easy to erode too, so a lot of local jobs around Lake David Park and newer builds nearby involve bringing in fill to level yards, backfill trenches, or raise ground before a patio or shed pad goes in. Because the native soil is already sandy, fill dirt here needs to be compacted in lifts rather than left to settle on its own. Skipping that step is how you end up with a low spot again in a year.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level my whole backyard in Groveland?

Yes, that is one of the most common uses, especially where sandy soil has washed out or settled unevenly over time. Plan on placing it in 6 to 8 inch lifts and compacting each layer so the yard does not sink again later. If you want grass to grow on top, cap the graded fill with a few inches of topsoil before seeding or sodding.

Answer

How many yards of fill dirt do I need to raise a low spot by 8 inches?

One cubic yard covers about 54 square feet at 6 inches, so at 8 inches that same yard covers roughly 40 square feet. For a 500 square foot low spot at 8 inches, you are looking at around 12 to 13 cubic yards, plus a little extra since compaction will reduce the finished depth.

Answer

Do I need to compact fill dirt before building on it?

Yes, always. Fill dirt is structural material, not something you can just dump and walk away from. Place it in 6 to 8 inch lifts, compacting each one, especially if you are building up ground near a foundation, pool, or patio slab. Uncompacted fill will keep settling for years, which shows up as cracks or low spots later.

Answer

Where can the delivery truck drop the fill dirt on my property?

Wherever you have a clear, accessible path wide enough for a delivery truck, ideally close to your work area since moving fill dirt by hand or wheelbarrow adds up fast. Let us know at checkout where you want the load placed. Avoid spots near septic lines, well heads, or soft ground the truck could rut.

Answer

Should I use fill dirt or topsoil for backfilling around my pool?

Use fill dirt for the structural backfill since it compacts well and is meant to bear weight, then cap the top few inches with topsoil if you want grass or plants growing around the pool deck. Topsoil alone will not compact reliably and is not meant to carry structural load, so it settles unevenly around pools and foundations.