About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches deep depending on how low the ground sits. Measure the low area in square feet, decide your target depth, then order in cubic yards accounting for compaction, since loose fill settles once you tamp it down. For a foundation backfill or a low yard near Wolf Lake, it is common to need more than the flat math suggests once compaction is factored in.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Hammond Fill Dirt Delivery

Hammond Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches deep depending on how low the ground sits. Measure the low area in square feet, decide your target depth, then order in cubic yards accounting for compaction, since loose fill settles once you tamp it down. For a foundation backfill or a low yard near Wolf Lake, it is common to need more than the flat math suggests once compaction is factored in.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Hammond Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs finish with a cap of screened topsoil once the fill is compacted, since fill dirt is not meant to grow anything on its own. If the finished grade will see grass or beds, plan on topsoil and maybe compost on top. For drainage-sensitive spots near the lake flats, some crews add a gravel layer under the fill for a firmer base.

Mulch Mound Pro Tip

Because Hammond's native soil is heavy clay, do not just dump fill dirt on top of wet clay and walk away. Build it in 6 to 8 inch lifts and compact each one with a plate tamper before adding the next, or you will get uneven settling for years, especially near the water table around Wolf Lake. Skipping this step is the single most common reason a filled yard develops dips again within a season or two.

Mulch Mound Pro Tip

Time fill work for a dry stretch if you can. Hammond's clay holds water long after a rain, and compacting wet fill just squeezes water around instead of tamping the soil tight. Wait a few dry days after the last frost thaw in spring, usually after April 25, so the ground underneath is not still frozen or saturated when your load goes down.

Mulch Mound Pro Tip

Fill dirt is not a growing medium, it is structural, so do not pay for extra yards just to skip a topsoil cap. Order enough fill to reach 2 to 3 inches below your finished grade, compact it properly, then cap with a thinner topsoil layer. That combination costs less overall than over-ordering fill and gives you a better surface for grass or beds anyway.

Grading and Filling in Hammond

Hammond sits low at 585 feet with heavy clay underneath, and that clay does not absorb water fast, so yards near Wolf Lake and the Calumet lowlands tend to pond after a hard rain. Fill dirt is how you get ahead of that, building pads and grades up before anything else goes in. Because the native soil here is already dense clay, adding more clay based fill and compacting it properly gives you a stable base that will not shift or wash out over the season. This is structural work, not planting work, so it comes before your topsoil, not instead of it.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to grow grass directly on top?

Not directly. Fill dirt is subsoil meant to raise and stabilize grade, it lacks the organic content grass needs. Compact your fill in lifts to the depth you need, then cap it with a few inches of screened topsoil before seeding or sodding. Skipping the topsoil cap usually means poor, patchy growth even if the grade looks fine.

Answer

How many cubic yards do I need to fill a low spot in my yard?

One cubic yard covers about 54 square feet at 6 inches deep. Measure your low area's square footage, decide if you need 6 or up to 12 inches of fill, then divide accordingly, adding a bit extra since compacted fill settles below its loose depth once tamped down.

Answer

When is the best time to bring in fill dirt in Hammond?

Fill dirt is project driven, so timing depends on your job, not the season, but working during a dry stretch makes compaction much easier. Hammond's clay holds moisture, so avoid filling right after heavy rain or before the ground thaws fully in spring, generally after April 25.

Answer

Where will the truck place the fill dirt on delivery day?

The truck drops the load wherever you direct at checkout, typically the driveway or curbside closest to your project. Clear a path beforehand since fill dirt is heavy and dense, and have equipment ready to move and compact it in lifts rather than leaving it in one large pile.

Answer

Should I get fill dirt or topsoil for backfilling around my pool?

Fill dirt is the right call for backfilling around a pool or foundation, since it is a structural subsoil meant to be compacted in lifts for stability. Topsoil is for the finish layer where grass or plants will grow. Most pool jobs use fill dirt to bring the grade up, then cap with topsoil at the surface.”

More delivery around Hammond, Indiana

All Hammond, Indiana landscape supply