About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Great service. We ordered topsoil from Mulch Mound and the best experience. Thank you so much!

One cubic yard of mason sand covers roughly 324 square feet at a 1 inch depth, which is the typical range for paver joints and bedding work, usually run between 1 and 2 inches. For a mid size patio or walkway project, most homeowners order somewhere between half a yard and two yards depending on square footage and whether they are doubling the depth for a sub base. Measure your project area first and work backward from the depth you actually need.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

High Point Sand Delivery

High Point Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Great service. We ordered topsoil from Mulch Mound and the best experience. Thank you so much!

One cubic yard of mason sand covers roughly 324 square feet at a 1 inch depth, which is the typical range for paver joints and bedding work, usually run between 1 and 2 inches. For a mid size patio or walkway project, most homeowners order somewhere between half a yard and two yards depending on square footage and whether they are doubling the depth for a sub base. Measure your project area first and work backward from the depth you actually need.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of High Point Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Mason sand pairs naturally with paver base gravel underneath and clean chip stone if you want a joint fill that will not pump out under traffic. If you are mixing mortar for a brick project, you will also want portland cement and lime on hand before the load arrives. Most hardscape jobs need both a structural base layer and this finer sand on top, not one or the other.

Mulch Mound Pro Tip

Mason sand is being phased out as paver bedding in a lot of markets in favor of clean chip stone, because chip stone locks together and will not pump up through the joints under vehicle weight or heavy rain. If your project is a driveway or anything that sees regular traffic, ask about chip stone for the base and joints. Save the mason sand for mortar mixing or lighter foot traffic patios where pumping is not a real concern.

Mulch Mound Pro Tip

Do not screed and set pavers on mason sand right before a heavy rain. High Point gets enough spring and fall rain that an uncompacted sand bed can wash out or shift before the pavers lock in, leaving low spots. Give the base a day of dry weather to settle and compact before setting stone, especially if you are working through the wetter shoulder seasons.

Mulch Mound Pro Tip

If your project needs both a structural base and a finer top layer, order the crushed stone base and the mason sand together in one delivery instead of two separate trips. It saves a delivery charge and it means the whole job can move forward in one weekend rather than waiting on a second load mid project.

Working With Sand in High Point

High Point sits on red clay that holds water and shifts with the freeze thaw cycle between our Nov 3 and Apr 19 frost dates. That movement is hard on patios and walkways unless the base underneath drains well, and mason sand in the joints and bedding layer gives water somewhere to go instead of pooling under pavers. A lot of the furniture warehouses and showroom districts around town have loading docks and walkways that were set on sand beds decades ago and still need topping off. It is also the standard choice for anyone mixing mortar on site for brick or block work, which is common in a city with this much masonry history.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is mason sand the same as regular sand from a hardware store?

Not quite. Mason sand is washed and screened to a finer, more uniform grain than typical bagged sand, which is what makes it workable for mortar and tight paver joints. Bagged sand can vary in grain size and cleanliness, while a bulk load is consistent from top to bottom, which matters when you are mixing mortar to a specific ratio.

Answer

How many cubic yards do I need for a paver patio?

One cubic yard covers about 324 square feet at a 1 inch depth, which is the standard bedding thickness for most patios. A typical 200 square foot patio at that depth needs a little under a yard, but order slightly more to account for compaction and joint fill on top of the bedding layer.

Answer

When is the best time to install a sand bed for pavers in High Point?

Spring through fall is prime hardscape season here, once the ground has thawed after our last frost around Apr 19 and before it firms back up near Nov 3. Avoid setting a sand bed right before heavy rain, since an uncompacted layer can shift or wash out before the pavers are locked in.

Answer

Where will the sand be dropped and do I need to be home?

The driver places the load wherever you specify at checkout, typically a driveway or curb near the work area. You do not need to be home, but the drop spot should be clear and accessible, since the truck cannot maneuver around parked cars or tight gates.

Answer

Should I use mason sand or chip stone for my paver joints?

For patios and walkways with light foot traffic, mason sand still works fine and is the traditional choice. For driveways or anywhere with vehicle weight and regular water exposure, chip stone is increasingly preferred because it locks in place and will not pump out over time the way sand can.

More delivery around High Point, North Carolina

All High Point, North Carolina landscape supply