About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Delivery was seamless, and the truck driver took care to deposit the mulch on the tarp I had laid out. The mulch itself is much better quality than my previous experiences with bagged mulch.

One cubic yard covers roughly 324 square feet at a 1 inch depth, and most paver joint or mortar sand jobs run 1 to 2 inches deep depending on the application. For a typical patio joint fill you are usually looking at well under half a yard, but mortar mixing for a block wall or larger masonry job can add up fast, so measure your total square footage first and figure your depth before ordering.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Lima Sand Delivery

Lima Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Delivery was seamless, and the truck driver took care to deposit the mulch on the tarp I had laid out. The mulch itself is much better quality than my previous experiences with bagged mulch.

One cubic yard covers roughly 324 square feet at a 1 inch depth, and most paver joint or mortar sand jobs run 1 to 2 inches deep depending on the application. For a typical patio joint fill you are usually looking at well under half a yard, but mortar mixing for a block wall or larger masonry job can add up fast, so measure your total square footage first and figure your depth before ordering.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Lima Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most jobs using this sand also need paver base gravel or chip stone underneath, since chip stone is what a lot of builders around here now use in place of sand bedding because it will not pump out over time. If you are mixing mortar, have your cement and any coloring additives on hand before delivery so you are not waiting on a supply run mid pour.

Mulch Mound Pro Tip

Because Lima's clay heavy silt loam drains slowly, keep bagged or piled mason sand covered with plastic sheeting if rain is forecast before you use it. Wet sand still works fine for mortar, but it throws off your water to mix ratio and can make a batch too soupy to hold a joint line. A quick tarp over the pile saves you from having to guess at adjustments the morning of a pour.

Mulch Mound Pro Tip

A common mistake is using this sand as full paver bedding instead of joint fill. It is finer than concrete sand, and under freeze thaw cycles like ours it can migrate or wash out from beneath pavers over a few seasons. Many contractors here have shifted to chip stone as the actual bedding layer and use mason sand only to sweep into the joints on top.

Mulch Mound Pro Tip

If you are mixing mortar for a multi day block or brick project, order your full estimated yardage up front rather than in batches. Sand from different loads can vary slightly in moisture and fineness, and matching mortar color and workability across two separate deliveries is harder than it sounds, especially on a visible wall or chimney face.

Working With Sand in Lima

Lima sits on silt loam, which drains slower than sandy soils and holds moisture longer through our zone 6b winters. That matters for hardscape work because a joint or bedding layer that stays damp too long can shift or heave once temperatures swing toward the Apr 25 last frost. This sand is fine enough to lock tight in paver joints and resist that movement better than a coarser fill would. Most of our orders here go into mortar batches for block work or joint sand for patios near Ottawa Metro Park style backyard builds.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as mason sand I would buy in bags at a hardware store in Lima?

Yes, it is washed and finely screened the same way, just delivered in bulk by the cubic yard instead of forty pound bags. For anything beyond a small patch job, ordering by the yard is faster and usually less handling than stacking bags in a truck bed.

Answer

How much sand do I need for a paver patio joint fill?

One cubic yard covers about 324 square feet at a 1 inch depth, but joint fill only uses a thin layer swept into the gaps, not a full inch across the whole patio. Most residential patios need well under a yard for joints alone, so measure your square footage and expect to use only a fraction of that coverage figure.

Answer

When is the best time to do paver or mortar work in Lima before the ground freezes?

Aim to finish hardscape and masonry projects before the Oct 16 first frost, since mortar cures poorly in cold, damp conditions and joint sand can shift if the ground starts to freeze and thaw. Spring through fall is our real work window, with late spring after the Apr 25 last frost being ideal for consistent curing temperatures.

Answer

Where will the delivery truck put the sand and do I need to be home?

You choose the drop location when you schedule delivery, typically a driveway or curbside spot with clear overhead access for a dump truck. You do not need to be present, but the area should be clear and reachable, since the driver places the load where you designated rather than hauling it further onto the property.

Answer

Should I use mason sand or chip stone under my new patio pavers?

For the bedding layer itself, many builders now prefer chip stone since it will not pump out from under pavers over time the way sand can. Mason sand still has its place swept into the joints on top and mixed into mortar, it is just not the strongest choice as the full bedding base anymore.

More delivery around Lima, Ohio

All Lima, Ohio landscape supply