About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

At a 1 inch depth, one cubic yard covers about 324 square feet, so a typical paver patio or pool base needs less than you'd think, most residential jobs run half a yard to two yards depending on footprint. Mortar mixing uses far less volume per job but benefits from having a full yard on hand so you are not stopping mid pour. Since it is sold by the cubic yard, measure your area first and work backward from the 324 square foot figure at your planned depth.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Marquette Sand Delivery

Marquette Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).

At a 1 inch depth, one cubic yard covers about 324 square feet, so a typical paver patio or pool base needs less than you'd think, most residential jobs run half a yard to two yards depending on footprint. Mortar mixing uses far less volume per job but benefits from having a full yard on hand so you are not stopping mid pour. Since it is sold by the cubic yard, measure your area first and work backward from the 324 square foot figure at your planned depth.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Marquette Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Mason sand pairs with paver base gravel underneath and polymeric jointing sand on top for a proper hardscape build, and with portland cement for anyone mixing mortar on site. Some crews around Marquette have started swapping the paver bedding layer for clean chip stone instead, since it does not pump or shift the way sand can under freeze thaw cycles. If you are pouring a pool base, a geotextile fabric under the sand helps keep it from migrating into the surrounding soil.

Mulch Mound Pro Tip

Mason sand's fine, uniform grain is what makes mortar workable, but that same fineness means it holds water differently than coarser concrete sand. In Marquette's damp spring thaw, a stockpile left uncovered can turn heavy and clumpy fast. If you are mixing mortar over several days, tarp the pile between batches so you are not fighting soggy sand every morning before your mix even starts.

Mulch Mound Pro Tip

A common mistake on paver jobs here is using mason sand as the bedding layer under the pavers themselves. It works, but freeze thaw cycles common through a Marquette winter can pump fine sand up through paver joints over a few seasons, leaving gaps. Many contractors have shifted to clean chip stone for that bedding layer specifically because it locks in place and does not migrate the way sand does.

Mulch Mound Pro Tip

If your project needs both a bedding layer and joint fill, do not default to mason sand for both. Save the fine washed sand for mortar and joint work where its uniform grain actually matters, and use a coarser base material underneath for structural support. This split saves you from over-ordering the more refined, and often pricier per yard, mason sand for a job where a cheaper base product does the structural work just as well.

Working With Sand in Marquette

Marquette sits on sandy loam already, so this is not about loosening heavy clay like it would be further south. Here mason sand shows up on hardscape jobs, mortar for stone work near the harbor, joint fill for paver patios, and leveling beds for pool installs. With the ground freezing hard by mid October and staying locked up past the last frost in May, most of these projects get one real shot each year, spring through fall. Having enough sand on site before you start a mortar batch or a paver bed matters more here than in a longer building season.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is mason sand the same as regular sand for my yard?

No, mason sand is washed and finely screened specifically for mortar mixing and precise applications like paver joints or pool bases. It is more uniform than general fill sand or the sandy loam already in Marquette yards, which is why masons and hardscape crews rely on it instead of digging from a general sand pile.

Answer

How much sand do I need for a paver patio?

One cubic yard covers about 324 square feet at a 1 inch depth, so a 300 square foot patio needs roughly one cubic yard for jointing, less if you are only filling gaps rather than a full bedding layer. Measure your patio's square footage first, then plan around that 324 square foot figure at your intended depth.

Answer

When is the best time to schedule a paver or pool project in Marquette?

Spring through fall is the real building window here, since the ground freezes solid by mid October and last frost typically holds until mid May. Most hardscape crews push to finish before the October freeze, so ordering sand early in that window avoids scheduling crunches later in the season.

Answer

Where will the sand be placed when it's delivered?

The delivery truck places your load at an accessible spot on your property that you designate, typically a driveway or open area near your project. Clear the path beforehand and make sure there is enough room for the truck to maneuver, especially if your property has tight or sloped access.

Answer

Should I use mason sand or chip stone under my pavers?

Mason sand has traditionally been the standard paver bedding layer, but many contractors now prefer clean chip stone for that specific use since it resists the pumping and shifting that fine sand can experience through freeze thaw cycles. Mason sand still works well for joint filling and mortar mixing where its fine, uniform texture is the actual advantage.

More delivery around Marquette, Michigan

All Marquette, Michigan landscape supply