About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Great service. We ordered topsoil from Mulch Mound and the best experience. Thank you so much!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches, so plan on two yards per 54 square feet if you're going deeper. Measure the low area's length and width, decide your target depth, and order by the cubic yard rather than guessing with bags, since fill jobs are usually bigger than they look from the porch.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Marshfield Fill Dirt Delivery

Marshfield Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Great service. We ordered topsoil from Mulch Mound and the best experience. Thank you so much!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches, so plan on two yards per 54 square feet if you're going deeper. Measure the low area's length and width, decide your target depth, and order by the cubic yard rather than guessing with bags, since fill jobs are usually bigger than they look from the porch.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Marshfield Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs finish with a cap of topsoil once the grade is where you want it, since fill dirt itself isn't meant to grow anything. If you're building up before a patio or shed pad, a layer of crushed gravel on top of the compacted fill gives you a firmer base than dirt alone. Either pairs easily with a fill delivery on the same job.

Mulch Mound Pro Tip

Fill dirt has to go down in lifts, not one big dump. Spread it in layers 6 to 8 inches deep and compact each one before adding the next, with a plate compactor or hand tamper for smaller jobs. Skip this and the pile looks fine for a season, then settles unevenly once frost works through it over a Marshfield winter, leaving dips right where you least want them, next to a foundation or under a walkway.

Mulch Mound Pro Tip

The most common mistake is treating fill dirt as topsoil and trying to plant straight into it. It's subsoil, screened of debris but stripped of the organic matter that makes silt loam productive here. Cap any area where grass, shrubs, or a garden bed is going with 4 to 6 inches of real topsoil after the fill is compacted, otherwise you'll fight poor drainage and weak growth for years.

Mulch Mound Pro Tip

If you're raising a large low area, order fill dirt for the bulk of the depth and save topsoil for just the top layer, mixing the two wastes money since topsoil costs more per yard and fill does the structural job just as well underneath. This pairing also cuts down on total truck trips if you order both for the same delivery window.

Grading and Filling in Marshfield

Marshfield's silt loam drains slowly compared to sandier soils, which means low spots around Hub City hold water well into spring and stay soft. Fill dirt gives you a stable base to raise that grade above the water table before anything else goes on top. With a last frost around May 26 and frost heave a real concern through winter, uncompacted fill will settle and crack whatever sits on it, patios, sheds, walkways. Local builders who backfill around foundations near older homes, some close to the Upham Mansion era of construction, know the ground here needs to be built up in stages, not dumped and walked away from.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level a low spot in my backyard in Marshfield?

Yes, that's one of the most common uses. Spread it in 6 to 8 inch lifts and compact each layer as you go, especially given how much our silt loam holds moisture through spring. If grass or plants are going in afterward, cap the final grade with a few inches of topsoil since fill dirt itself won't support growth well.

Answer

How many cubic yards of fill dirt do I need for a 200 square foot area?

At a 6 inch depth, one cubic yard covers about 54 square feet, so 200 square feet needs roughly 3.7 cubic yards, call it 4 to allow for compaction. If you're going to 12 inches deep, double that to about 7.5 yards. Measure your actual area and depth before ordering since fill jobs often run bigger than expected.

Answer

When is the best time to bring in fill dirt before winter hits?

Aim to finish grading and compacting before the ground starts to freeze, usually well ahead of our typical first frost around September 28. Fill dirt compacts more reliably when the soil isn't already cold or wet through, and finishing before frost gives it a season to settle before anything gets built on top.

Answer

Will the delivery truck be able to access my property?

Most residential driveways and yards work fine, but the truck needs a clear path at least as wide as a standard vehicle with no low branches or tight turns. Let us know at checkout if your access is tight, gated, or on a slope, and mark your preferred drop spot so the driver can place the load close to your work area.

Answer

Should I get fill dirt or topsoil for building up my yard?

Use fill dirt for the bulk of the depth, it's cheaper by the yard and does the structural work of raising grade or backfilling. Reserve topsoil for the final 4 to 6 inches where grass, shrubs, or garden beds are actually going, since fill dirt lacks the organic content plants need. Most raise and build jobs use both, fill below, topsoil on top.

More delivery around Marshfield, Wisconsin

All Marshfield, Wisconsin landscape supply