About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!

Fill dirt is sold by the cubic yard, and one yard spread at a 6 inch depth covers roughly 54 square feet. A backfill job around a foundation wall might only need a few yards, while raising a low quarter acre lot before a pool install can run into dozens of yards, so measure the actual footprint and depth you need to fill before ordering. It compacts as you go, so order for the finished depth you want, not the loose volume.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

New Braunfels Fill Dirt Delivery

New Braunfels Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!

Fill dirt is sold by the cubic yard, and one yard spread at a 6 inch depth covers roughly 54 square feet. A backfill job around a foundation wall might only need a few yards, while raising a low quarter acre lot before a pool install can run into dozens of yards, so measure the actual footprint and depth you need to fill before ordering. It compacts as you go, so order for the finished depth you want, not the loose volume.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of New Braunfels Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs in New Braunfels get capped with a few inches of topsoil once the grade is set, especially if sod or a garden bed is going in on top. If the finished area needs drainage work, a layer of crushed base or gravel underneath a paved or high traffic section pairs well with the fill below it. Think in layers, fill for structure, topsoil for growth, mulch or gravel for the finished surface.

Mulch Mound Pro Tip

Never dump fill dirt in one deep layer and call it done. Place it in 6 to 8 inch lifts and compact each one with a plate compactor or hand tamper before adding the next. Skip this step on New Braunfels clay loam and you will watch the fill settle unevenly for a year or two, cracking any patio, walkway, or shed pad you built on top of it too soon.

Mulch Mound Pro Tip

Fill dirt is not a growing medium, it has no organic matter and compacts too hard for roots. If grass, beds, or trees are going in the finished area, cap the compacted fill with 4 to 6 inches of actual topsoil before planting. Skipping the cap is the most common mistake we see, people plant straight into fill and wonder why nothing takes.

Mulch Mound Pro Tip

Order slightly more than your calculated volume, since fill compacts down 10 to 20 percent once tamped, and running short mid job means a second delivery and a visible seam where the two loads meet. If you are also topping with soil or mulch, plan the fill delivery first and let it settle a few days before capping, especially with New Braunfels clay underneath holding moisture longer after rain.

Grading and Filling in New Braunfels

New Braunfels sits on clay loam that holds water and swells when it is wet, which is exactly why so many yards here have drainage problems near foundations, pools, and low fence lines. Fill dirt gives you a stable base to correct grade before that clay ever gets involved, so water moves away from the house instead of pooling against it. With river frontage and flood-prone low areas common around here, raising a build pad above grade before construction or a pool install is standard practice, not overkill. This is structural material, so it does the heavy lifting before topsoil or sod finishes the job.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Will fill dirt grow grass or plants on its own?

No, fill dirt is subsoil with no organic content, meant purely for structure and grading. It compacts too dense for roots to establish. Once your grade is set and compacted, cap it with 4 to 6 inches of topsoil before seeding, sodding, or planting anything.

Answer

How many cubic yards of fill dirt do I need to raise a low spot in my yard?

One cubic yard covers about 54 square feet at a 6 inch depth. Measure your low area's square footage, decide how many inches you need to raise it, and calculate from there, then round up since fill compacts 10 to 20 percent once tamped down.

Answer

Can I install fill dirt myself or do I need a contractor?

Small backfill jobs are DIY friendly with a hand tamper, but larger pads, especially under a pool or structure, need compaction in 6 to 8 inch lifts, ideally with a plate compactor. If the fill is load bearing for construction, check with your contractor or the local permit office on compaction standards before building on top.

Answer

Where will the fill dirt be placed on delivery day, and what do I need to clear?

The load gets dropped at a driveway or curbside spot you designate at checkout, so clear a path wide enough for a delivery truck and mark the exact drop location beforehand. From there it is moved by wheelbarrow or equipment to the final grading spot.

Answer

What is the difference between fill dirt and topsoil for my project?

Fill dirt is subsoil screened of debris, used for structural grading, backfill, and raising low ground, it has no nutrients and is not meant to grow anything. Topsoil is the finishing layer on top, with organic matter for planting. Most grading jobs use both, fill below, topsoil on top.

More delivery around New Braunfels, Texas

All New Braunfels, Texas landscape supply