Ordered Dirt. Received Dirt. Would Buy Again.

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
Wonderful experience! They put the mulch exactly where we wanted. This mulch spread very easily and didn’t have the usual “mulch smell.” We will de...
Read full review
Wonderful experience! They put the mulch exactly where we wanted. This mulch spread very easily and didn’t have the usual “mulch smell.” We will definitely use again!
Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of cautio...
Read full review
Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!
Complete Your Outdoor Project
Most jobs using this sand also need paver base stone or crushed gravel underneath for structural support, along with edging to keep joint sand from migrating over time. If you are pouring a pool base, a layer of compactable base material below the sand is standard practice. Concrete sand is a separate product if your project needs a coarser mix for footings.
Service area
Areas we deliver sand in Ocean Acres, New Jersey
Mason sand is finer and more uniform than concrete sand, which is exactly what makes it workable in mortar, but that same fineness means it holds water differently. In Ocean Acres humidity, keep bagged or piled sand covered before use so your mortar mix ratio stays consistent. Wet sand thrown into a mix without adjusting water content is one of the most common reasons mortar comes out either too stiff or too soupy on site.
A lot of hardscapers are moving away from sand for paver joint fill and toward clean chip stone instead, because chip stone does not pump up through joints the way sand can under freeze thaw cycles. With our winter frost line reaching down to around 15 to 18 inches some years, sand joints on patios can heave slightly over a few seasons. If long term joint stability matters more than upfront cost, ask about chip stone for that specific application.
If you are doing both mortar work and a pool base on the same property, order both quantities together rather than in separate deliveries, since combining a load saves a trip and keeps material staged in one place. Sand piles compact down over a few days of sitting, so order slightly more than your calculator suggests if the job will stretch out over a week or two.
Working With Sand in Ocean Acres
Ocean Acres sits on sandy, well drained ground near the Pine Barrens, so builders here are used to working with sand already, but native sand is too coarse and variable for mortar or paver joint work. Masons and hardscapers doing patios around Ocean Acres Lake Park or in the neighborhoods nearby need the finer, washed grade for consistent mortar mix and tight joint fill. Pool installers also lean on this grade for pool base leveling since it compacts evenly under liners. It is not a fill or grading material, it is a finishing and bedding product for specific jobs.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.