About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Very happy with the ease of ordering. Delivery went exactly as planned. Garden soil looks great and couldn’t be happier.

One cubic yard covers about 324 square feet at a 1 inch depth, and most mortar and paver joint work only needs 1 to 2 inches placed, not spread across a whole yard. For a typical patio joint fill job, figure the square footage of the paver area and work in fractions of a yard rather than ordering a full load you will not use. Mortar mixing jobs are usually sized by the block or brick count, so a mason on site can tell you the ratio before you order.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Odessa Sand Delivery

Odessa Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Very happy with the ease of ordering. Delivery went exactly as planned. Garden soil looks great and couldn’t be happier.

One cubic yard covers about 324 square feet at a 1 inch depth, and most mortar and paver joint work only needs 1 to 2 inches placed, not spread across a whole yard. For a typical patio joint fill job, figure the square footage of the paver area and work in fractions of a yard rather than ordering a full load you will not use. Mortar mixing jobs are usually sized by the block or brick count, so a mason on site can tell you the ratio before you order.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Odessa Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most jobs pairing mason sand also need chip stone for base work under pavers, since loose sand alone pumps and settles under traffic over time. If you are mixing mortar for block work, order your block or brick at the same time so timing lines up with a single delivery window. Some crews add a bagged cement product on site rather than through us, since that is usually a hardware store pickup.

Map of the sand delivery area around Odessa, Texas

Service area

Areas we deliver sand in Odessa, Texas

Mulch Mound Pro Tip

West Texas wind and low humidity dry mortar mix faster than most masons expect, especially in the summer months here. Mix mason sand in smaller batches than you would in a wetter climate, and keep the stockpile covered with plastic between uses so it does not dry out before you get to it. A pile left uncovered on a windy Odessa afternoon can crust over within an hour, which throws off your water ratio.

Mulch Mound Pro Tip

A common mistake is using mason sand as paver base fill instead of joint fill. It is too fine and uniform for that job and it will pump up through joints under foot traffic or rain, which is exactly why most crews doing base work now reach for angular chip stone instead. Save the mason sand for the top layer, the joints, and mortar, not the compacted base underneath.

Mulch Mound Pro Tip

If your project includes both a paver base and joint fill, order chip stone and mason sand together so you are not paying for two separate delivery trips. Odessa's sandy loam subgrade already drains well, so you rarely need extra base depth here compared to heavier clay soils, which can shave a bit off your total material need.

Working With Sand in Odessa

Odessa sits on sandy loam already, so drainage is rarely the issue, workability is. Mason sand gets used here mostly for mortar mixing on block and brick work, and for filling paver joints on the patios and walkways that go in during the long dry stretch between last frost in April and first frost in November. The low humidity and wind common to West Texas dry mortar mix fast, so masons here often mix in smaller batches and keep this sand covered and damp until it is used. It is not a base material, so it does not compete with the fill you are already trucking in for grading.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as the sand masons use for brick and block work around Odessa?

Yes, this is washed mason sand, finer and more uniform than concrete sand, which is what makes it workable for mortar mixing. It is the standard choice for brick and block jobs and for filling paver joints, not for structural base or drainage work.

Answer

How much sand do I need for a paver patio joint fill?

One cubic yard covers about 324 square feet at a 1 inch depth, but joint fill only needs a thin top layer, not full depth across the patio. Most residential patios use a fraction of a yard, so measure your paver square footage and order accordingly rather than rounding up to a full load.

Answer

When is the best time to install pavers or do mortar work in Odessa?

Spring through fall is peak hardscape season here, roughly between the April 8 last frost and the November 12 first frost. Mortar cures more predictably in that window since freezing temperatures outside those dates can compromise the set before it hardens fully.

Answer

Where does the truck place the sand on delivery day?

The load gets dumped in one spot, usually a driveway or a flat cleared area near your work zone, since the truck does not spread or move material once it is dropped. Delivery is scheduled at checkout, so have your access area cleared and know where you want the pile before the truck arrives.

Answer

Should I use mason sand or chip stone under my pavers?

For the base layer under pavers, chip stone is now the more common choice since it locks together and resists pumping under traffic, unlike loose mason sand. Save mason sand for the top joint fill between pavers and for mortar mixing, that is where its fine, uniform texture actually helps instead of causing problems.

More delivery around Odessa, Texas

All Odessa, Texas landscape supply