About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

The website to order is super easy to use. Pick a mulch, date/time/driveway location of the delivery and that’s it. A few days later there was a nice mound of mulch in my driveway. Great service - just as promised.

At a 1 inch depth, one cubic yard covers roughly 324 square feet, so a small paver patio or a mortar batch for a stone wall usually needs less than a full yard. Since typical install depth for this material runs 1 to 2 inches, cut that coverage number in half if you are going deeper for a pool base or heavier joint work. Measure your area in square feet first, then work backward from the depth you actually need.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

No description provided.

Olathe Sand Delivery

Olathe Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

The website to order is super easy to use. Pick a mulch, date/time/driveway location of the delivery and that’s it. A few days later there was a nice mound of mulch in my driveway. Great service - just as promised.

At a 1 inch depth, one cubic yard covers roughly 324 square feet, so a small paver patio or a mortar batch for a stone wall usually needs less than a full yard. Since typical install depth for this material runs 1 to 2 inches, cut that coverage number in half if you are going deeper for a pool base or heavier joint work. Measure your area in square feet first, then work backward from the depth you actually need.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

No description provided.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Olathe Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Paver jobs usually call for a base material underneath before this sand ever touches the joints, and many Olathe crews are now using clean chip stone instead of sand for bedding since it will not pump out over time. If you are mixing mortar for a stone retaining wall or a Mahaffie style farmhouse patio, keep bags of cement on hand since the sand alone does not bind.

Mulch Mound Pro Tip

For mortar mixing in Olathe's clay heavy soil conditions, keep your sand dry and covered before use since damp sand throws off your water to cement ratio and makes mortar hard to work in the heat of a summer build. A tarp over the pile, weighted at the corners, keeps it consistent from the first scoop to the last, especially on multi day jobs.

Mulch Mound Pro Tip

A common mistake on paver projects is using this fine washed sand as the bedding layer under pavers instead of just for joint fill. It shifts and pumps out under freeze thaw cycles, which Olathe sees plenty of between the October and April frost dates. Use chip stone for bedding and save this material strictly for sweeping into joints after the pavers are set.

Mulch Mound Pro Tip

If you are pairing this sand with a pool installation, order your base material and this sand at the same time so both loads are on site before your pool crew starts, since staging two separate deliveries on a tight residential lot in Olathe can slow down the schedule and cost you a work day.

Working With Sand in Olathe

Olathe sits on heavy clay, which is fine for lawns but a problem for anyone trying to hand mix mortar or set pavers on native soil without a proper bedding layer. This sand gives masons the workability that clay-heavy local dirt cannot, and it is uniform enough that pool installers and hardscapers around town rely on it for consistent joint fill. With hardscape season running spring through fall here, most orders come in for patios and paver walks tied to new outdoor living projects. It is not a substitute for coarser bedding sand or chip stone, so match it to the job.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

What is this sand actually used for on a typical job in Olathe?

It is used for mortar mixing, sweeping into paver joints, and as a pool base layer. It is not meant as general fill or drainage material. If your project involves mortar or joint work, this is the right product, but for base or fill work you want a different material entirely.

Answer

How many cubic yards do I need for a paver patio?

For joint fill at a 1 inch working depth, one cubic yard covers about 324 square feet, though most patios only use a fraction of that in actual joint volume. Measure your patio square footage and estimate joint coverage rather than total patio size, since you are filling gaps, not the whole surface.

Answer

When is the best time to schedule a sand delivery for hardscaping in Olathe?

Spring through fall is peak hardscape season here, between the April last frost and the October first frost, so material moves fast and yards get busy. Ordering a few days ahead of your project start keeps your job on schedule instead of waiting on availability.

Answer

Where will the delivery truck place the load at my house?

The truck drops the material at the spot you designate at checkout, typically a driveway or curb area near your project. Make sure that spot is clear and accessible, and put down a tarp or plywood first if you want to protect the surface underneath.

Answer

Should I use this sand or chip stone for my paver bedding layer?

For bedding, most installers in Olathe now use clean chip stone instead of this sand, since chip stone locks together and will not pump out over time the way sand can under freeze thaw cycles. Save this sand for the joint fill on top, once the pavers are already set in place.

More delivery around Olathe, Kansas

All Olathe, Kansas landscape supply