About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

This was the easiest process to purchase mulch! It arrived on time and the driver did an amazing job putting it exactly where I wanted it. I will be a return customer for sure.

One cubic yard covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches deep depending on how much you need to raise the grade. Measure the low area in square feet, decide your target depth, and order in cubic yards from there. For larger jobs like pool backfill or full yard regrading, it adds up fast, so it helps to break the area into sections and total them separately.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Orem Fill Dirt Delivery

Orem Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

This was the easiest process to purchase mulch! It arrived on time and the driver did an amazing job putting it exactly where I wanted it. I will be a return customer for sure.

One cubic yard covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches deep depending on how much you need to raise the grade. Measure the low area in square feet, decide your target depth, and order in cubic yards from there. For larger jobs like pool backfill or full yard regrading, it adds up fast, so it helps to break the area into sections and total them separately.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Orem Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs in Orem finish with a topsoil cap once the grade is built up, especially if grass or beds are going in on top. If you are backfilling around a pool or foundation, a layer of compactable base gravel underneath the fill can help with drainage before you bring in the dirt. Mulch or bark comes later, once the growing layer is in place.

Mulch Mound Pro Tip

Alkaline loam like what you have around Orem can hold water at the surface longer than sandy soil, which slows compaction if you rush the job. Place fill dirt in lifts of no more than 6 to 8 inches and compact each layer before adding the next, especially near foundations or pool walls. Skipping this step is the number one reason people end up with sunken spots a year or two later, right when they thought the job was done.

Mulch Mound Pro Tip

A common mistake is treating fill dirt like it is ready for planting straight away. It is subsoil, not topsoil, so it lacks the organic matter and structure that roots need. If you are building up a bed or lawn area, always cap the fill with several inches of real topsoil once the fill has been compacted and settled, otherwise you will fight poor drainage and stunted growth for seasons.

Mulch Mound Pro Tip

Because fill dirt is a structural material rather than a finish material, it makes sense to order exactly what the grading calls for rather than rounding way up. Pair a fill dirt delivery with a smaller topsoil order for the cap layer instead of buying one blended product, since the two serve completely different jobs and blending them wastes the fill's compaction strength.

Grading and Filling in Orem

Orem sits at 4,767 feet on alkaline loam, and a lot of the older neighborhoods have settled unevenly over the decades, leaving low spots near foundations and along fence lines. With frost arriving around October 21 and lasting into late April, contractors here work in a tighter window and need fill that compacts predictably rather than shifting the next spring. Fill dirt is the right call for pool backfill, foundation grading, and building up sunken yard areas before topsoil goes on top. It is not a growing medium, so anything you plan to plant still needs a topsoil cap.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Is fill dirt the same thing as topsoil?

No. Fill dirt is subsoil screened of debris, meant for structural work like raising grade or backfilling foundations. Topsoil has organic matter and is meant for growing. If you are planting anything, plan on a topsoil layer over the compacted fill rather than trying to grow directly in it.

Answer

How many cubic yards do I need to fill in a low spot by my foundation?

One cubic yard covers about 54 square feet at 6 inches deep. Measure the low area in square feet, decide how deep you need to build it up, usually 6 to 12 inches for foundation work, and divide accordingly. Round up slightly since compaction will settle the material a bit after placement.

Answer

Can I install fill dirt right before winter in Orem?

You can, but with first frost typically landing around October 21, it is worth finishing compaction before the ground starts freezing at Orem's elevation. Cold, wet soil is harder to compact evenly, which raises the risk of settling in spring. If timing is tight, aim for a dry stretch and compact each lift thoroughly before temperatures drop.

Answer

Where will the delivery truck place the fill dirt?

The load gets dropped in one spot, usually your driveway or the closest accessible point to your project area, since trucks cannot spread material as they unload. Make sure there is clear access for a full size delivery truck and a flat spot for the pile before your delivery date, which you choose at checkout.

Answer

Should I get fill dirt or a fill dirt and topsoil blend for my project?

Straight fill dirt is better for structural work like backfilling or raising grade, since it compacts predictably in lifts. A blended product compacts less reliably and is really meant for smaller finishing jobs. For most Orem projects, order fill dirt for the structural build up and a separate topsoil layer on top for anything that needs to grow.

More delivery around Orem, Utah

All Orem, Utah landscape supply