Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wan...
Read full review
First time going with this company for mulch and it was an efficient process from start to finish. Website was easy—I told them exactly where I wanted the mulch put on my driveway, and it was delivered perfectly when I got home from work the next day. Best deal around when I compared it to competitors and I will definitely be becoming back.
Ordered Dirt. Received Dirt. Would Buy Again.
Complete Your Outdoor Project
Most sand orders in Rainbow City show up alongside pavers or natural stone for patios and walkways, or paired with gravel as a sub base before the sand layer goes down. If you are doing mortar work, you will also want your masonry cement on hand before the load arrives. Pool installers often order sand and a base gravel together to keep the job moving in one delivery.
Service area
Areas we deliver sand in Rainbow City, Alabama
Mason sand is finer and more uniform than concrete sand, which is exactly why it mixes into workable mortar instead of a stiff, gritty paste. If you are doing paver joint fill instead of mortar work, know that many contractors in clay soil regions are switching to chip stone for joints because it locks in place and will not pump up through pavers the way sand can when the base below it shifts or holds water.
A common mistake on red clay lots is skipping a proper compacted base before laying sand, assuming the sand alone will stabilize the surface. It will not. Sand needs a firm, well drained base underneath, especially with clay subgrade nearby that holds moisture longer after rain. Address drainage first, then screed your sand layer evenly at 1 to 2 inches before setting pavers or stone.
If your project needs both a base layer and a sand layer, ask about scheduling gravel and mason sand as separate deliveries timed a few days apart rather than trying to store both piles on site at once. This keeps your work area clear and reduces the chance of the two materials mixing together on smaller lots where space to stage material is limited.
Working With Sand in Rainbow City
Rainbow City sits on heavy red clay, and that clay does not drain or settle the way sand does, which is exactly why so many hardscape jobs here start with a proper sand layer instead of trying to build directly on native soil. Masons in the area lean on this finer, more uniform mason sand because it mixes into workable mortar that the coarser concrete sand just will not do. With hardscape season running spring through fall here, most orders come in for paver patios and pool decks going in before the humidity peaks. Some contractors are shifting paver bedding to chip stone since it will not pump the way sand can under heavy clay subgrade, worth discussing before you order.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.