I have ordered twice now, a pleasure to deal with, easy and fast delivery, beautiful mulch!

How It Works
Getting started is easy — just follow these simple steps
Choose your quantity
Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.
Select your delivery date
Select a delivery date you'd like for the product to be dropped off at your home
Sit back and wait
Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.
Highest compliments. Great driver.
Website is easy to navigate. Just a seamless process. 5 stars!!
I needed 3 yards of top soil and that's what I got! Right on time and right where I asked it to be placed (Order# 2041).
Complete Your Outdoor Project
Mason sand is often ordered alongside crushed base material for paver projects, with the base going down first and sand filling joints or bedding on top. If you are mixing mortar for repair work, pair it with bagged cement rather than trying to source both bulk. For pool decks, a compacted base layer under the sand keeps things from settling unevenly after our seasonal rains.
For mortar mixing in San Angelo's heat, work in smaller batches than you would in cooler climates, sand and mortar mix set up faster once temperatures climb past 90 degrees. Keep the pile shaded or lightly damp if it sits more than a day before use, dried out mason sand loses some of its workability and can make mortar harder to trowel smoothly on repair or repointing jobs.
A common mistake with paver joint sand is sweeping it in dry and calling it done. Water it in lightly after sweeping to settle grains into the joints, then add a second pass. Skipping this step means joints open back up within a season, especially with the freeze thaw cycles this area gets between November and March.
If you are bedding pavers, consider whether chip stone makes more sense than sand for your project, it locks in place and will not pump up through joints the way sand can after heavy rain. Sand still makes sense for mortar mixing and pool base work where its fine, uniform grain is actually the point, so match the material to the specific job rather than defaulting to one product for everything.
Working With Sand in San Angelo
San Angelo sits on clay loam soil, which is not the sand's job to fix, this material stays on top as a working surface or bedding layer rather than a soil amendment. Around here it shows up most on masonry jobs tied to the area's stone and stucco building tradition, think mortar for repair work near Fort Concho style construction, plus pool decks and paver patios that hold up through our hot, dry summers. Because the climate swings from triple digit summers to occasional hard freezes near the Nov 4 to Mar 15 frost window, a well compacted sand base matters for anything that needs to resist heaving. Some crews here are shifting paver bedding over to chip stone since it does not pump the way sand can under repeated freeze thaw or heavy rain events.
Masonry vs Fill Sand
Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.
Bedding and Leveling
For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.
Working With Moisture
Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.