About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!

Fill dirt weighs in around 1.3 tons per cubic yard, and one yard spread at a 6 inch depth covers roughly 54 square feet. Most jobs run a 6 to 12 inch install depth, so a low spot that is 10 by 10 feet at 8 inches deep is going to take a little over 2 yards. Measure the footprint and the depth you need to raise it, then order in cubic yards from there.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

The Woodlands Fill Dirt Delivery

The Woodlands Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

Placing an order online was so easy. Delivery was on time. When the driver realized we had a newly poured driveway they erred on the side of caution and opted not ti drive in it. The company even sent me a message explaining that call. Would recommend!

Fill dirt weighs in around 1.3 tons per cubic yard, and one yard spread at a 6 inch depth covers roughly 54 square feet. Most jobs run a 6 to 12 inch install depth, so a low spot that is 10 by 10 feet at 8 inches deep is going to take a little over 2 yards. Measure the footprint and the depth you need to raise it, then order in cubic yards from there.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of The Woodlands Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill jobs in The Woodlands finish with a layer of topsoil on top once the fill is compacted, especially where grass or beds need to establish afterward. If you are building up a pad for a structure, a base layer of crushed limestone or road base under the fill can help with long term stability. Mulch or compost comes in later, once the growing layer is actually in place.

Map of the fill dirt delivery area around The Woodlands, Texas

Service area

Areas we deliver fill dirt in The Woodlands, Texas

Mulch Mound Pro Tip

Place fill dirt in 6 to 8 inch lifts and compact each one before adding the next, do not dump the whole load and grade it once. In sandy loam like ours, uncompacted fill keeps settling for a year or more, which shows up later as sunken spots along foundations or pool decks. A plate compactor rented for an afternoon is cheap insurance against redoing the grading next spring.

Mulch Mound Pro Tip

The most common mistake we see is treating fill dirt as a growing medium and planting straight into it. It is subsoil, stripped of the organic content that grass and beds need, so cap it with 4 to 6 inches of real topsoil before seeding or sodding. Skip that step and you will be fighting bare patches no matter how much you water.

Mulch Mound Pro Tip

If your project needs both structural fill and a finished growing layer, order them as separate deliveries rather than trying to blend one load. Fill dirt is sold and priced as subsoil, topsoil is a different product entirely, and keeping them separate on site makes compaction and grading far more predictable, especially on a pool or foundation job where the fill layer has to do real structural work.

Grading and Filling in The Woodlands

The Woodlands sits at a modest 154 feet of elevation with sandy loam soil that drains well but also shifts and settles more than people expect once you start piling material on top of it. That makes compaction non negotiable here, low spots near patios and pool decks will keep sinking for seasons if the fill goes in loose. Because this is a project driven material and not a seasonal one, the timing question is really about your build schedule, not the calendar. Whether you are backfilling around a new pool shell or building a pad before a shed, the fill needs to be placed in controlled lifts to hold its shape in this soil.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Is fill dirt the same as topsoil?

No, fill dirt is subsoil from excavation, screened of debris but stripped of the organic matter that topsoil has. It is meant to raise grade and provide structural bulk, not to grow anything in. If you are planting after filling, cap the fill with a few inches of topsoil.

Answer

How many cubic yards of fill dirt do I need to fix a low spot in my yard?

One cubic yard covers about 54 square feet at a 6 inch depth. Measure the length and width of the low area, decide how deep it needs to be raised, usually 6 to 12 inches, and calculate from there. A 200 square foot spot at 8 inches deep runs close to 5 cubic yards.

Answer

Can I install fill dirt myself or do I need a compactor?

You can spread it yourself, but compaction is not optional. Place it in 6 to 8 inch lifts and compact each one, either with a rented plate compactor or by watering and tamping in stages. Skipping compaction in our sandy loam almost guarantees settling around foundations and pool decks over the following year.

Answer

Where will the delivery truck place the fill dirt?

The truck drops the load at an accessible spot you choose, usually a driveway or hardened area close to the work zone. Fill dirt is heavy and hard to move far by hand, so pick a drop point near where you are grading. Delivery scheduling happens at checkout, not on a set day we assign in advance.

Answer

Should I use fill dirt or crushed base material for a shed pad?

Fill dirt works for raising general grade, but for a load bearing pad, many builders use a compactable base material underneath and fill dirt only where extra bulk is needed. If your pad carries real weight, ask about layering fill dirt with a base course rather than relying on fill alone.

More delivery around The Woodlands, Texas

All The Woodlands, Texas landscape supply