About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

The website to order is super easy to use. Pick a mulch, date/time/driveway location of the delivery and that’s it. A few days later there was a nice mound of mulch in my driveway. Great service - just as promised.

One cubic yard of sand covers about 324 square feet at a 1 inch depth, so a typical patio joint fill or bedding job of 300 to 600 square feet usually runs 1 to 2 cubic yards depending on your target depth. Since install depth for this material is only 1 to 2 inches, most residential jobs do not need more than a yard or two. Measure your actual square footage before ordering so you are not stuck moving leftover sand off the driveway.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Topeka Sand Delivery

Topeka Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

The website to order is super easy to use. Pick a mulch, date/time/driveway location of the delivery and that’s it. A few days later there was a nice mound of mulch in my driveway. Great service - just as promised.

One cubic yard of sand covers about 324 square feet at a 1 inch depth, so a typical patio joint fill or bedding job of 300 to 600 square feet usually runs 1 to 2 cubic yards depending on your target depth. Since install depth for this material is only 1 to 2 inches, most residential jobs do not need more than a yard or two. Measure your actual square footage before ordering so you are not stuck moving leftover sand off the driveway.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Topeka Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Sand pairs naturally with paver base gravel underneath and paver joint sweep on top, and many Topeka jobs also need edge restraint to keep everything from creeping in clay soil. If you are mixing mortar for capitol district stone repair work, you will also want cement and a mixing surface on site before delivery.

Mulch Mound Pro Tip

If you are bedding pavers in Topeka's clay, do not skip the compaction step just because sand feels stable underfoot. Clay subgrades shift more than sandy loam through freeze thaw cycles, and an uncompacted sand layer will telegraph every bit of that movement up into your pavers by the second winter. Compact in lifts, wet the sand slightly, and check for level before you set the first paver.

Mulch Mound Pro Tip

A common mistake is confusing this washed sand with all purpose fill sand from a big box store. This material is finer and more uniform, which is exactly why it works for mortar and joint fill but it is not meant for bulk grading or drainage layers. Using the wrong sand for the job usually shows up later as cracked mortar or joints that wash out after a heavy rain.

Mulch Mound Pro Tip

For paver bedding specifically, more contractors are moving to clean chip stone instead of sand because it does not pump up through the joints under traffic and pressure washing. If your project is strictly mortar mixing or pool base work, sand is still the right call, but ask about chip stone if you are building a paver patio that will see regular foot traffic.

Working With Sand in Topeka

Topeka sits on heavy clay, which is fine for lawns but terrible for anything that needs to drain or stay level, like a paver patio or a mortar bed for capitol area stonework. Sand gives you a workable, uniform layer that clay just cannot provide on its own. With zone 6b freeze thaw cycles between the October and April frost dates, a sand base under pavers needs to be properly compacted or it will shift come spring. Most of our sand orders here go toward mortar mixing and paver joints rather than broad landscape coverage.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

Is this the same as mason sand for mortar work in Topeka?

Yes, this washed and finely screened sand is what is often called mason sand in some regions, and it is the standard choice for mixing mortar because of its fine, uniform grain. It is also used for paver joint fill and pool bases. If you are mixing mortar for stonework repair, this is the correct material.

Answer

How many cubic yards do I need for a paver patio's joint fill?

One cubic yard covers about 324 square feet at a 1 inch depth, and joint fill typically only needs a thin top layer, so most patios under 500 square feet need well under a full cubic yard. Measure your patio's total area and figure a light 1 inch pass to estimate your order.

Answer

What time of year should I schedule sand delivery in Topeka?

Hardscape season here runs spring through fall, roughly after the last frost around April 22 and before the first frost around October 13. Working with mortar or setting pavers in freezing temperatures is a bad idea, so most crews schedule sand deliveries well within that window.

Answer

Where will the delivery truck place the sand pile?

We place the load wherever you designate at checkout, typically a driveway or curbside spot near your project. Make sure the area is clear and accessible for a delivery truck, and let us know ahead of time if there are low branches or tight turns to navigate.

Answer

Should I use sand or chip stone under my pavers?

Sand has traditionally been used for paver bedding, but many contractors now prefer chip stone because it resists pumping up through joints under foot traffic and pressure washing. If your project is mortar mixing or a pool base, sand is still the better choice, but for a high traffic paver patio, ask us about chip stone instead.

More delivery around Topeka, Kansas

All Topeka, Kansas landscape supply