About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most jobs call for 6 to 12 inches depending on how much you are raising the grade. Measure the low area's length and width, decide how many inches you need to bring it up, and that tells you how many yards to order. For anything deeper than 8 inches, plan on placing it in layers rather than one pour.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Albany Fill Dirt Delivery

Albany Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

We had a great experience with mulch mound! Our mulch arrived when we requested. The delivery fee was so reasonable. We’ll use them again for sure!

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most jobs call for 6 to 12 inches depending on how much you are raising the grade. Measure the low area's length and width, decide how many inches you need to bring it up, and that tells you how many yards to order. For anything deeper than 8 inches, plan on placing it in layers rather than one pour.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Albany Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs finish with a few inches of topsoil on top, since fill dirt itself will not support grass or plants once compacted. If you are backfilling around a new pool or foundation wall, a layer of gravel underneath the fill can help with drainage before you build up. Compaction equipment, even a hand tamper for small areas, makes a real difference in how long the work holds.

Map of the fill dirt delivery area around Albany, Georgia

Service area

Areas we deliver fill dirt in Albany, Georgia

Mulch Mound Pro Tip

Albany's sandy loam already drains well, so the risk with fill dirt here is not standing water, it is under compaction. Place it in 6 to 8 inch lifts and compact each one before adding the next, whether that means a plate compactor for a big backfill or hand tamping for a small area around a foundation. Skipping this step is why people see the same low spot come back two summers later after the fill settles on its own.

Mulch Mound Pro Tip

A common mistake is trying to plant grass directly into fill dirt because it looks like ground. It is subsoil, not topsoil, and it lacks the organic content anything green needs to root. Cap it with 4 to 6 inches of actual topsoil once the fill is compacted and graded, then seed or sod on top of that. Skipping the cap layer means a bare patch no matter how much water or seed you put down.

Mulch Mound Pro Tip

If you are filling a large low area, pair fill dirt with a thinner topsoil layer instead of using topsoil for the whole depth. Fill dirt does the structural work for a fraction of the cost of topsoil, and topsoil only needs to be as deep as your root zone, usually 4 to 6 inches. This split keeps the project cheaper without weakening the base.

Grading and Filling in Albany

Albany sits at a modest 210 feet of elevation with sandy loam soil underneath, which drains fast but also shifts and settles more than clay ever will. That means low spots near foundations, sheds, and pool decks tend to reappear year after year if they were never properly filled. Fill dirt gives you a stable base to build on, especially before pouring concrete or laying topsoil for a lawn. It is not a growing medium, it is the structural layer that everything else sits on top of.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Is fill dirt the same as topsoil for my Albany yard?

No, fill dirt is subsoil used to raise or build up ground, while topsoil is the growing layer on top. Fill dirt is screened of debris but has little organic matter, so nothing will grow in it well. Most projects use fill dirt to raise the grade, then cap it with topsoil where grass or plants need to establish.

Answer

How many cubic yards of fill dirt do I need to raise a low spot?

One cubic yard covers about 54 square feet at 6 inches deep. Measure the length and width of your low area in feet, multiply for square footage, then divide by 54 for a 6 inch fill, or by 27 for a 12 inch fill. Round up since fill dirt compacts after placement.

Answer

How soon can I build on fill dirt after it is delivered?

It depends on how well it is compacted, not how long it sits. Fill dirt placed in 6 to 8 inch lifts and compacted at each stage can support structures, patios, or topsoil fairly quickly. Uncompacted fill dirt will keep settling for months or years, so do not skip the compaction step regardless of your timeline.

Answer

Where will the truck put the fill dirt on delivery day?

The load gets placed at a single spot you mark ahead of time, ideally close to where you are working since fill dirt is heavy to move by hand. Make sure the path is clear for a dump truck and there is enough room to tip the load without hitting fences, trees, or power lines.

Answer

Should I use fill dirt or gravel to fix drainage around my pool?

Fill dirt is for raising grade and backfilling, not for drainage, since it compacts tight and holds water similarly to Albany's sandy loam subsoil. If drainage is the main issue, a gravel base under the fill dirt gives water somewhere to go. For straight grade correction with no drainage concern, fill dirt alone does the job.

More delivery around Albany, Georgia

All Albany, Georgia landscape supply