About this landscape rock

Smooth tumbled river rock, heavy enough to stay put in drainage runs and handsome enough for beds and borders.

Online ordering was really simple and I liked the transparent pricing.

One cubic yard of landscape rock covers about 162 square feet at a 2 inch depth, which is the standard install thickness for groundcover in most Brawley yards. If you want more visual weight or better weed suppression along a fence line, going to 3 inches will use roughly a third more material for the same footprint. Measure your bed square footage first, then decide between 2 and 3 inches depending on how much of a barrier you want against clay soil pushing up.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Brawley Landscape Rock Delivery

Brawley Landscape Rock Delivery

4.7
137 reviews
Regular price $132.00 per Yard
Regular price Sale price $132.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local landscape rock, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your landscape rock isn't the quantity or quality you ordered, we'll make it right.

About this landscape rock

Smooth tumbled river rock, heavy enough to stay put in drainage runs and handsome enough for beds and borders.

Online ordering was really simple and I liked the transparent pricing.

One cubic yard of landscape rock covers about 162 square feet at a 2 inch depth, which is the standard install thickness for groundcover in most Brawley yards. If you want more visual weight or better weed suppression along a fence line, going to 3 inches will use roughly a third more material for the same footprint. Measure your bed square footage first, then decide between 2 and 3 inches depending on how much of a barrier you want against clay soil pushing up.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Brawley Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most rock jobs here go down over landscape fabric to keep the clay soil from working its way up between the stones over time. Steel or plastic edging along driveways and walkways keeps rock from migrating onto pavement, which matters more in Brawley where wind and monsoon runoff can push loose material around. Some customers add a run of mulch near shrubs or trees that still need organic matter, since rock alone will not feed those plants.

Mulch Mound Pro Tip

Brawley's silty clay soil compacts hard and drains slowly, so always lay landscape fabric before rock goes down, never rock straight on bare clay. Fabric stops the clay from mixing up into your rock layer over the years, which is what makes rock beds here look muddy and patchy after a few monsoon seasons. Skipping this step is the single biggest reason people redo rock jobs early in this valley.

Mulch Mound Pro Tip

The most common mistake in Brawley is installing rock too close to trees or shrubs that need regular water and organic feeding. Rock holds heat and reflects it back at plant stems, which stresses anything not built for true desert exposure. Keep rock a few inches back from trunks and stick to true xeric plants, or use mulch rings around anything that needs to stay cool and fed.

Mulch Mound Pro Tip

Buying rock by the cubic yard in one delivery is more efficient than repeat bagged trips from a hardware store, especially with Brawley's summer heat making multiple trips miserable. If you are covering a large front yard, consider ordering slightly over your calculated amount, since clay soil settling can eat up a half inch of your depth within the first year and leave bare patches showing through.

Decorative Stone in Brawley

Brawley sits low, at minus 112 feet elevation, with silty clay soil that holds water and cracks hard when it dries out. Rock groundcover works with that reality instead of fighting it, since it does not need the soil amendments organic mulch relies on to break down properly. In a zone 10a desert climate with a short cool window between mid December and late January frost dates, rock does not shrink, fade, or need replacing after one brutal summer. It is common here to see rock run the length of a property against block walls and around downspouts, where clay soil tends to pond water after a rare rain.

What Landscape Rock Is

Landscape rock is stone chosen for how it looks as much as what it does. River rock is smooth and rounded, decomposed granite is fine and packs firm underfoot. Both are sold by the cubic yard for beds, borders, paths, and dry creek beds.

River Rock vs Decomposed Granite

River rock stays loose and rolls, so it suits beds, borders, and drainage runs where it can sit in place. Decomposed granite compacts into a firm surface, so it suits paths, patios, and anywhere you will walk or roll a wheelbarrow.

Depth and Coverage

Spread river rock 2 to 3 inches deep over landscape fabric so it stays put and weeds stay down. Lay decomposed granite 3 to 4 inches deep, wet it, and compact it in lifts for a surface that sheds water instead of rutting.

Frequently Asked Questions

Click a question to see the answer

Answer

Will landscape rock hold up in Brawley's summer heat without fading?

Yes, screened decorative rock is mineral, so it does not fade, bake, or break down like mulch does under 110 degree summer sun. It is one of the few groundcovers that actually looks close to the same after five years here as it did on install day, which is why so many Brawley front yards use it instead of bark.

Answer

How many cubic yards do I need for a 500 square foot front yard?

At the standard 2 inch depth, one cubic yard covers about 162 square feet, so a 500 square foot yard needs roughly 3 cubic yards. If you want a heavier 3 inch depth for better coverage over clay soil, plan on closer to 4.5 cubic yards for the same area.

Answer

Is there a bad time of year to install rock in Brawley?

Rock can go down any time of year since it does not depend on planting seasons, but most people avoid installing during peak summer afternoons when the ground and the material itself get too hot to work with comfortably. Cooler mornings, or the stretch around the December to January frost window, tend to be more comfortable install times.

Answer

Where will the delivery truck place the rock on my property?

We place the load wherever you direct us on your driveway or a staging area near your project, and you will confirm the drop location and delivery window at checkout. Just make sure the path is clear of low branches, gates, or parked cars so the truck can get close enough to avoid extra wheelbarrow trips.

Answer

Should I use rock or mulch around my house in Brawley?

Rock is the better call for foundation beds, downspout areas, and anywhere you want a one time install that will not need refreshing, since it does not decompose or feed weeds. Mulch still makes sense around trees and shrubs that benefit from organic matter breaking down into that silty clay soil, so many yards here end up using both in different zones.

More delivery around Brawley, California

All Brawley, California landscape supply