About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches, so a mid size backfill or low spot correction often takes several yards. Measure the square footage of the area and the depth you need to bring it up, then order in cubic yards accounting for compaction, since loose fill settles once you tamp it down. It pays to round up rather than run short mid project.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Buckeye Fill Dirt Delivery

Buckeye Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

One cubic yard of fill dirt covers about 54 square feet at a 6 inch depth, and most structural fill jobs run 6 to 12 inches, so a mid size backfill or low spot correction often takes several yards. Measure the square footage of the area and the depth you need to bring it up, then order in cubic yards accounting for compaction, since loose fill settles once you tamp it down. It pays to round up rather than run short mid project.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Buckeye Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs finish with a cap of topsoil once the grade is where you want it, especially if turf or planting beds go on top. Some Buckeye projects also pair fill with a layer of base rock under patios or sheds for extra stability before the final surface goes down. If you are backfilling around a pool or foundation, having both fill dirt and topsoil on the same delivery schedule keeps the job moving.

Mulch Mound Pro Tip

Compact fill dirt in 6 to 8 inch lifts, not all at once. In Buckeye's sandy loam, a single deep dump looks solid on day one but keeps settling for a year or more as it dries and shifts under its own weight. Water each lift lightly before compacting if the material seems bone dry, since dry fill resists packing and leaves voids that show up as dips later.

Mulch Mound Pro Tip

The most common mistake with fill dirt is treating it like topsoil and planting straight into it. It has no nutrient value and compacts too hard for roots to establish. Always cap finished fill with 4 to 6 inches of real topsoil before seeding, sodding, or planting anything, even drought tolerant desert landscaping needs that looser top layer to take root properly.

Mulch Mound Pro Tip

If you are backfilling a large area, order fill dirt and topsoil together on the same delivery rather than staggering them. It saves a second trip charge and keeps the job on one timeline, since the fill needs to be compacted and settled before the topsoil cap goes down anyway. Planning both at once also makes it easier to estimate total yardage in one pass.

Grading and Filling in Buckeye

Buckeye sits on sandy loam that drains fast but also shifts and settles over time, which is exactly why fill dirt has to be compacted in lifts here rather than dumped and left. With so much new construction and lot leveling happening as the city expands, fill dirt gets used constantly for pad building, low spot correction, and pool backfill before final grading. The dry climate helps with compaction timing since the material dries out and packs quicker than in humid regions. Just remember this is structural material, not something to plant into, so anything growing needs a topsoil cap on top.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

What exactly is fill dirt and is it the same as topsoil?

No, fill dirt is subsoil excavated locally and screened of debris, sold as a structural material for raising grade and backfilling. It has no organic content and is not meant for planting. Topsoil is a separate, nutrient rich product you cap fill dirt with once the grade is set and something needs to grow on top.

Answer

How many cubic yards of fill dirt do I need for a low spot in my yard?

One cubic yard covers about 54 square feet at 6 inches deep. Measure your low spot's square footage, decide how deep it needs to be filled, usually 6 to 12 inches, and divide accordingly. Round up slightly since compaction settles loose fill down after it is placed.

Answer

Can I install fill dirt myself or do I need equipment?

You can install it yourself with a shovel, rake, and a hand tamper for smaller jobs, but anything over a few yards benefits from a plate compactor rental. Spread it in 6 to 8 inch lifts and compact each one before adding the next, especially in Buckeye's sandy loam where uncompacted fill keeps settling for a long time.

Answer

Will the delivery truck dump fill dirt right where I need it?

The truck places the load at one accessible drop location near your work area, it is not spread across the yard by the driver. Make sure there is a clear path for the truck and enough room to dump, and plan on moving it from the pile to its final spot yourself or with equipment.

Answer

Do I need fill dirt or would base rock work better for my project?

Fill dirt is the right choice for raising grade, backfilling around foundations or pools, and building up low areas before topsoil. Base rock is better under patios, sheds, or driveways where you need a stable, well draining base that will not compact further over time. Many jobs use both, fill first, then base rock closer to the surface.”}(“}

More delivery around Buckeye, Arizona

All Buckeye, Arizona landscape supply