About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Great service. We ordered topsoil from Mulch Mound and the best experience. Thank you so much!

One cubic yard of this sand covers about 324 square feet at a 1 inch depth, which is the typical install range for joint fill and bedding work at 1 to 2 inches. For deeper applications like pool base prep, figure closer to half that coverage per yard. Measure your square footage first, then decide where in that 1 to 2 inch range your project actually needs to land.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Lake Hopatcong Sand Delivery

Lake Hopatcong Sand Delivery

4.7
137 reviews
Regular price $74.00 per Yard
Regular price Sale price $74.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Minimum of 3 Yard
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local sand, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your sand isn't the quantity or quality you ordered, we'll make it right.

About this sand

Washed and finely screened masonry sand for mortar, paver joints, and pool bases. Consistent grain, ready to screed.

Great service. We ordered topsoil from Mulch Mound and the best experience. Thank you so much!

One cubic yard of this sand covers about 324 square feet at a 1 inch depth, which is the typical install range for joint fill and bedding work at 1 to 2 inches. For deeper applications like pool base prep, figure closer to half that coverage per yard. Measure your square footage first, then decide where in that 1 to 2 inch range your project actually needs to land.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Lake Hopatcong Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Mason sand pairs naturally with pavers, edge restraints, and polymeric jointing sand on the same job. If you're doing a pool deck or retaining wall near the lake, gravel or crushed stone for the base course usually comes first, with the sand layer going in after. Order both in the same delivery window if your project calls for it.

Mulch Mound Pro Tip

At 925 feet elevation with a shorter frost free window ending mid October, mortar work needs to be finished with enough cure time before the first freeze. Cold mortar cures slower and can be weakened by early frost. If you're setting pavers or doing masonry work in fall, plan to wrap up by late September so the mix has real time to set before temperatures drop.

Mulch Mound Pro Tip

A common mistake is using this sand as paver bedding under the base course. It's built for joint fill and mortar work, not bedding, because it can pump out from under pavers over time with freeze thaw cycles. For bedding, clean chip stone holds up better and won't wash out, especially with the freeze thaw swings this area sees every winter.

Mulch Mound Pro Tip

Order slightly more than your calculated volume, sand settles and compacts during delivery and handling, so a yard on paper doesn't always stretch as far as expected on site. It's cheaper to have a little leftover for touch ups than to schedule a second small delivery for a patio or pool deck you thought was finished.

Working With Sand in Lake Hopatcong

Lake Hopatcong sits on gravelly sandy loam, which already drains well, but that native soil is too coarse and inconsistent for mortar work or paver joint fill. This finely screened sand gives masons the uniform texture that native soil can't provide. Around the lake, a lot of projects are pool decks, retaining walls near the shoreline, and paver patios on properties with lake views, all of which need a sand that behaves the same way in every scoop. It's not a soil amendment here, it's a construction material.

Masonry vs Fill Sand

Masonry sand is washed and finely screened, the right choice for mortar work, paver joints, and sandboxes. Fill sand is coarser and less processed, better suited to leveling, bedding pipe, and filling low spots.

Bedding and Leveling

For pavers, screed a 1 inch sand bed over a compacted base rather than using sand to fix deep grade problems. A thin, even bed locks pavers in place. A thick one shifts underfoot.

Working With Moisture

Slightly damp sand spreads, screeds, and compacts far more easily than bone dry sand, which just flows back into your screed lines. Lightly wetting the pile before you work it saves real effort.

Frequently Asked Questions

Click a question to see the answer

Answer

What is mason sand actually used for on a typical job here?

It's used for mortar mixing, filling paver joints, and as a base layer under pool installations. It's finer and more uniform than concrete sand, which is what makes it workable for mortar and clean for joint fill. It is not the right choice for paver bedding, where chip stone performs better long term.

Answer

How many cubic yards do I need for a paver patio's joint sand?

One cubic yard covers about 324 square feet at a 1 inch depth, but joint fill uses far less volume per square foot since it's only filling narrow gaps, not covering the surface. Measure your patio square footage, then order a fraction of what full coverage math suggests, usually a quarter yard covers a good sized patio's joints.

Answer

When is the best time to do hardscape or masonry work around the lake?

Spring through fall is peak season here, with the frost free window running roughly May through mid October. Mortar and concrete work needs time to cure before the first frost, so plan projects to wrap up by late September if possible. Working in a hard freeze weakens the cure and risks cracking.

Answer

Where will the delivery truck place the sand on my property?

You specify a drop location when you place your order, and the driver places the load there as long as there's clear access for a full size truck. A hard surface like a driveway works best, since wet sand can leave marks on grass and is harder to shovel from soft ground.

Answer

Should I use this sand or chip stone for my paver base?

For paver bedding, clean chip stone is the better modern choice, it locks together and won't pump out from under the pavers over time. This sand is better suited for mortar mixing and filling the joints between pavers after they're set, where its fine, uniform texture actually matters.

More delivery around Lake Hopatcong, New Jersey

All Lake Hopatcong, New Jersey landscape supply