About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I have ordered twice now, a pleasure to deal with, easy and fast delivery, beautiful mulch!

Fill dirt runs about 1.3 tons per cubic yard, and one yard covers roughly 54 square feet at a 6 inch depth. Most structural fill goes down 6 to 12 inches, so a small foundation backfill might need 3 to 5 yards while a low spot the size of a two car driveway can run 15 yards or more. Measure the area you are raising and the depth you need before ordering, then order by the yard rather than guessing.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

Reno Fill Dirt Delivery

Reno Fill Dirt Delivery

4.7
137 reviews
Regular price $38.00 per Yard
Regular price Sale price $38.00
Sale Sold out
Shipping calculated at checkout.
Type
Size
Hand-picked local yards
4,000+ regional deliveries
Dedicated support
Why order through Mulch Mound

The best local fill dirt, without the guesswork.

We hand-pick and partner with the best yards in your region, keep only the ones our buyers rate well, and back each load with our guarantee.

Mulch Mound Guarantee

If your fill dirt isn't the quantity or quality you ordered, we'll make it right.

About this fill dirt

Screened fill dirt free of debris, for raising low ground and backfilling. Structural material, place it in lifts and compact as you go.

I have ordered twice now, a pleasure to deal with, easy and fast delivery, beautiful mulch!

Fill dirt runs about 1.3 tons per cubic yard, and one yard covers roughly 54 square feet at a 6 inch depth. Most structural fill goes down 6 to 12 inches, so a small foundation backfill might need 3 to 5 yards while a low spot the size of a two car driveway can run 15 yards or more. Measure the area you are raising and the depth you need before ordering, then order by the yard rather than guessing.

A yard is approximately 27 cubic feet. As a general guideline, one yard of material can cover an area of about 100-160 square feet at a 2-3 inch depth.

View full details

How It Works

Getting started is easy — just follow these simple steps

1

Choose your quantity

Adjust the quantity to match your project. One cubic yard covers about 100 to 160 square feet at a 2 to 3 inch depth.

2

Select your delivery date

Select a delivery date you'd like for the product to be dropped off at your home

3

Sit back and wait

Sit back, wait, and let us work our magic to make sure the highest quality product is delivered to your driveway.

From The Mouths of Reno Folks

4.7
out of 5 based on 137 reviews
Google Reviews

Complete Your Outdoor Project

Most fill dirt jobs in Reno finish with a layer of topsoil once the grade is set, especially if grass or beds go in afterward. If you are backfilling around a foundation or pool wall, some customers also order a load of gravel for drainage at the base before the fill goes in. Think about what the finished surface needs to do before you order just fill.

Mulch Mound Pro Tip

Place fill dirt in lifts of 6 to 8 inches and compact each one before adding the next, especially before winter sets in. Reno's freeze thaw cycle at this elevation will find any loose pocket in uncompacted fill and turn it into a low spot by spring. A plate compactor rented for an afternoon is worth it on anything more than a small backfill job, and it costs far less than redoing the grade next year.

Mulch Mound Pro Tip

The most common mistake we see is trying to plant directly into fill dirt. It is subsoil, stripped of the organic matter that makes topsoil support root growth, so grass and plants struggle or fail in it. Always cap fill with several inches of topsoil once your grade is set, especially in Reno's already lean clay loam, which does not have much natural fertility to spare.

Mulch Mound Pro Tip

If your project only needs fill in some areas and topsoil in others, order them as separate deliveries rather than trying to blend one material for both jobs. Fill dirt is priced and used for volume and structure, topsoil for what grows in it, and keeping them separate on site makes it easier to place each one at the right depth without overthinking the mix.

Grading and Filling in Reno

Reno sits on clay loam that already drains slowly and compacts hard once it is wet, so fill dirt behaves differently here than it would in sandy ground. Builders use it to correct grade around foundations before the freeze thaw cycle at 4505 feet can heave a slab, and to build up low areas that pond during spring runoff. Because this is subsoil and not topsoil, it will not support planting on its own, so most jobs around town cap it with a few inches of topsoil once the grade is set. Compaction matters more here than in milder climates, since Reno winters freeze and thaw repeatedly and loose fill will settle unevenly by spring.

What Clean Fill Is

Clean fill is screened subsoil free of debris, roots, and contaminants. It is made for volume and grade, and it compacts predictably, which is exactly what you want under slabs, in trenches, and behind walls.

Fill Dirt vs Topsoil

Fill dirt builds the shape of the ground, topsoil grows things on top of it. Bring the grade up with fill, then cap it with 4 to 6 inches of topsoil anywhere grass or plants are going in.

Compact in Lifts

Place fill in layers of 4 to 6 inches and compact each one before adding the next. Dumping the full depth at once leaves voids that settle later, and settling is the one problem fill is supposed to solve.

Frequently Asked Questions

Click a question to see the answer

Answer

Can I use fill dirt to level my whole backyard in Reno?

Yes, fill dirt is the right material for raising low areas or leveling a yard before anything else goes down. Just plan to cap it with topsoil if you want grass or plants to grow there, since fill dirt itself is subsoil without the organic content plants need.

Answer

How many cubic yards of fill dirt do I need for a foundation backfill?

It depends on the perimeter and depth, but a typical residential foundation backfill runs 3 to 8 cubic yards. At 1.3 tons per yard and 54 square feet of coverage at 6 inches, measure your trench length, width, and depth to get a closer number before ordering.

Answer

When is the best time to bring in fill dirt before Reno's winter?

Since fill dirt is project driven rather than seasonal, timing depends more on your build schedule than the calendar. That said, getting fill placed and compacted before ground freeze in early October gives it more time to settle before spring, which is worth planning around if your project allows it.

Answer

Where will the delivery truck place the fill dirt on my property?

Delivery is scheduled at checkout and the truck drops the load in one spot, usually a driveway or curbside area you designate. Make sure that spot is wide enough and clear of low branches or soft ground, since a full load is heavy and moving it after drop off means wheelbarrowing it yourself.

Answer

Should I order fill dirt or topsoil for my project?

Order fill dirt if you are raising grade, backfilling a foundation, or building up structural elevation, and order topsoil if something needs to grow on top. Many Reno projects use both, fill dirt for the base and a topsoil cap for the finished surface where grass or plants go in.

More delivery around Reno, Nevada

All Reno, Nevada landscape supply